Laserfiche WebLink
t(2) 1 " CONDUITS <br />TO BUILDING <br />18 5 6 <br />B: TANK INSTALLATION - PLAN VIEW <br />SCALE: 1/4" = 1'-0" <br />0 <br />00 I <br />N <br />NOTE: <br />INSTALL 6" WIDE DETECTABLE UNDERGROUND <br />MARKING TAPE EMPIRE MAGNATEC #31-143 NOTE: <br />BURIED 6"-12" BELOW FINISHED GRADE ALL PRODUCT, VENT AND VAPOR PIPING <br />WHERE UNDERGROUND PRODUCT & VENT SHALL BE SIZE OVER SIZE FIBERGLASS <br />M-1 PIPING BY SMITH FIBERCAST <br />49'-11 7/8" 13 <br />DI NOTES UST ANCHORING <br />WHEN WORKING BELOW GRADE, EXTREME CARE MUST BE TAKEN TO <br />ASSURE WORKMEN SAFETY. SLOPING AND SHORING SHALL BE PROVIDED <br />TO COMPLY WITH OSHA CONSTRUCTION INDUSTRY STANDARDS 29 CFR <br />PART 1926 SUBPART P, OSHA STANDARDS -EXCAVATIONS: FINAL RULE <br />OCTOBER 1, 1989. HARDHATS SHALL BE WORN BY ALL WORKMEN <br />OPERATING IN EXCAVATION OR WHERE OVERHEAD WORK IS <br />PROGRESSING. <br />TANK ANCHORING REQUIRED WHEN A HIGH WATER TABLE IS <br />ENCOUNTERED OR IS REQUIRED BY LOCAL REGULATION. CONSULT WITH <br />OWNER'S REPRESENTATIVE. <br />13 INSTALL DEADMAN ANCHORS PER TANK MANUFACTURERS INSTALLATION <br />3 INSTRUCTIONS. <br />A4DIMENSIONS OF MANUFACTURER SUPPLIED DEADMAN FOR 10' DIA. <br />15,000 GAL. TANK ARE 18"x8"x14'L, QTY: (4) EACH TANK. DIMENSIONS <br />OF DEADMAN FOR 10' DIA. 20,000 GAL. TANK ARE 18"x8"x18'L, QTY: <br />(4) EACH TANK. <br />ZLTOTAL LENGTH OF FIELD CONSTRUCTED DEADMAN IS MIN. 12" GREATER <br />THAN OVERALL LENGTH OF TANK. <br />ZL EACH TANK REQUIRES DEADMAN ON EACH SIDE. <br />HOLD DOWN STRAPS ARE REQUIRED FOR 10,000, 12,000, 15,000, & <br />20,000 GALLON TANKS AS SPECIFIED AND SUPPLIED BY TANK <br />MANUFACTURER. <br />LOCATE STRAPS ON RIBS WHERE INDICATED ON TANK. <br />AggFASTEN WIRE WITH AT LEAST THREE CLAMPS AROUND DEADMAN AND <br />THROUGH THE END POINT OF THE HOLD DOWN STRAP. CLAMPS SHALL <br />BE ALTERNATED 180° FROM EACH OTHER. <br />ATTACH ALL HOLD DOWN STRAPS TO CABLE USING TURNBUCKLES. <br />10 UNIFORMLY TIGHTEN ALL STRAPS TO ACHIEVE EQUAL TENSION <br />Zlo\ <br />WITHOUT TANK DEFLECTION. MEASURE TANK DIAMETER BEFORE AND <br />AFTER TIGHTENING STRAPS TO ENSURE NO TANK DEFLECTION. <br />�11\ I WIRE ROPE MINIMUM DIAMETER 1/2". I <br />12 TURNBUCKLES: HOOK TYPE - 1-1/4" DIAMETER, JAW TYPE - 3/4" <br />DIAMETER, EYE TYPE - 3/4" DIAMETER <br />COAT ALL EXPOSED STRAPS, CABLES, TURNBUCKLES, AND REINFORCING <br />13 BARS WITH PITCHMASTIC. <br />14 INSTALL USTs SO THAT TOP OF TANKS ARE AT SAME HEIGHT. <br />IN UNSTABLE SOIL (AS DEFINED BY SOILS REPORT) THE DIMENSION <br />15 MUST BE 4 FT. FROM BOTH SIDES AND ENDS (WITH FIBERGLASS <br />TANKS) <br />FILTER FABRIC (DUPONT TYPAR OR MIRAFI 500X) IS REQUIRED FOR <br />16 WET HOLE INSTALLATIONS ONLY. FABRIC MUST EXTEND TO SLAB AND <br />MAY BE PINNED TO SIDE OF HOLE WITH WIRE, ETC. SEAMS MUST BE <br />LAPPED 1' MINIMUM. <br />A: TANK INSTALLATION - PLAN VIEW - BLENDING <br />ADJACENT LAYOUT <br />SCALE: 1/4" = 1'-0" <br />NOTE: <br />INSTALL 6" WIDE DETECTABLE UNDERGROUND <br />MARKING TAPE EMPIRE MAGNATEC #31-143 NOTE: NOTE: <br />BURIED 6"-12" BELOW FINISHED GRADE WHERE DIFFERENT SIZED TANKS ALL PRODUCT, VENT AND VAPOR PIPING <br />WHERE UNDERGROUND PRODUCT & VENT ARE USED, ALIGN THE FILL PORTS SHALL BE SIZE OVER SIZE FIBERGLASS <br />PIPING RUN TO FACILITATE TANKER DELIVERIES PIPING BY SMITH FIBERCAST <br />JILDING <br />°° <br />CONDUITS <br />5 6 <br />VACUUM SENSOR ZONE CHART (AUTO CANOPY) <br />X 42H): 0.9 <br />87 91 <br />DIESEL <br />ZONE 1 <br />ZONE 1 <br />ZONE 2 <br />ZONE 3 <br />ZONE 4 ZONE 5 <br />ZONE 6 <br />ZONE 7 <br />ZONE 8 <br />ZONE 9 <br />ZONE 10 <br />ZONE 11 <br />VOLUME <br />VR <br />PRODUCT <br />VENT <br />CROSSOVER VR <br />PRODUCT <br />VENT <br />CROSSOVER <br />PRODUCT <br />VENT <br />CROSSOVER <br />DESCRIPTION <br />& SIZE <br />VOLUME <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />4.14 QTY <br />TOTA <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />98.81 <br />82.3 <br />8.97 <br />5.52 <br />85.56 <br />6.9 <br />1.61 <br />61.18 <br />4.83 <br />1.61 <br />A.O. SMITH FIBERGLASS <br />RED THREAD <br />II <br />GAL./ TANK = <br />1.22 <br />CUBIC <br />METER (2) <br />= 2.44 <br />CUBIC <br />METER <br />8. 8,000 GALLON TANK CSI <br />74.2 <br />GAL./ TANK <br />I I w <br />0 O z o <br />(I II �z <br />UzOrn <br />z U U o <br />= 0.281 <br />CUBIC <br />METER <br />wQ <br />z <br />Q -- <br />C3 o U <br />p6 <br />V <br />YO OVER 2"0 0.23 GAL./FT. <br />Q <br />U O <br />358 <br />82.3 <br />39 <br />8.97 <br />18 <br />4.14 <br />DEVELOPMENT INFORMATION: <br />372 <br />85.56 <br />30 <br />6.9 <br />7 <br />1.61 <br />266 <br />61.18 <br />21 <br />4.83 <br />7 <br />1.61 <br />4"0 OVER 3"0 0.276 GAL./FT. <br />358 <br />98.81 <br />DRAWING TITLE: <br />UST INSTALLATION <br />(1)10'0 25K AND (1) 10'0120 OK <br />BLENDING <br />20 <br />5.52 <br />M,5,3,09 <br />VACUUM SENSOR ZONE CHART (TRUCK CANOPY) <br />X 42H): 0.9 <br />DIESEL <br />DEF TANK <br />ZONE 1 <br />ZONE 2 <br />ZONE 3 <br />ZONE 4 <br />ZONE 5 <br />PRODUCT <br />VENT <br />CROSSOVER <br />PRODUCT <br />VENT <br />DESCRIPTION & SIZE <br />VOLUME <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />QTY <br />TOTAL <br />73.14 <br />20.47 <br />2.76 <br />43.01 <br />10.58 <br />A.O. SMITH FIBERGLASS RED THREAD II <br />GAL. <br />X 2 = <br />3.0 <br />GAL. <br />= 0.114 <br />CUBIC <br />METER <br />5. 25,000 GALLON TANK (CSI) <br />419.8 <br />GAL./ TANK <br />3"0 OVER 2"0 <br />0.23 GAL./FT. <br />318 <br />73.14 <br />89 <br />20.47 <br />12 <br />2.76 <br />187 <br />43.01 <br />46 <br />10.58 <br />z <br />= 1.11 <br />CUBIC <br />METER <br />7. 20,000 GALLON TANK CSI <br />323.5 <br />GAL./ TANK = <br />1.22 <br />CUBIC <br />METER (2) <br />= 2.44 <br />HYDROSTATIC MONITORING VOLUME: <br />1. FILL SUMP (FLUID CONTAINMENT 48"DIA. <br />X 42H): 0.9 <br />GAL. <br />X 5 = <br />4.5 <br />GAL. = <br />0.017 <br />CUBIC <br />METER <br />2. TURBINE SUMP (FLUID CONTAINMENT 42"DIA <br />X <br />42"H): 0.8 <br />GAL. <br />X 6 = <br />4.8 <br />GAL. = <br />0.018 <br />CUBIC <br />METER <br />3. UNDER DISPENSER CONTAINMENT: <br />1.5 <br />GAL. <br />X 11 = <br />16.5 <br />GAL. <br />= 0.062 <br />CUBIC <br />METER <br />4. VENT TRANSITION BOX (BRAVO.): <br />0 <br />1.5 <br />GAL. <br />X 2 = <br />3.0 <br />GAL. <br />= 0.114 <br />CUBIC <br />METER <br />5. 25,000 GALLON TANK (CSI) <br />419.8 <br />GAL./ TANK <br />0 <br />SEAL: <br />= 1.60 <br />CUBIC <br />METER <br />6. SPLIT 22K (12K + 10K GALLON) TANK <br />(CSI) <br />294.1 <br />GAL./ <br />TANK <br />z <br />= 1.11 <br />CUBIC <br />METER <br />7. 20,000 GALLON TANK CSI <br />323.5 <br />GAL./ TANK = <br />1.22 <br />CUBIC <br />METER (2) <br />= 2.44 <br />CUBIC <br />METER <br />8. 8,000 GALLON TANK CSI <br />74.2 <br />GAL./ TANK <br />I I w <br />0 O z o <br />(I II �z <br />UzOrn <br />z U U o <br />= 0.281 <br />CUBIC <br />METER <br />TOTAL: 5.642 CUBIC METERS <br />VACUUM MONITORING VOLUME: <br />9. 2"/3" PRODUCT PIPING (1,501 FT.) 0.23 GAL./FT. X 1,501 FT. = 345.23 GAL. = 1.307 CUBIC METER <br />10. 3"/4" VAPOR PIPING (358 FT.) 0.276 GAL./FT. X 378 FT. = 104.33 GAL. = 0.395 CUBIC METER <br />11. 2"/3" VENT PIPING (225 FT.) 0.23 GAL/FT. X 225 FT. = 51.75 GAL. = 0.196 CUBIC METER <br />D: TANK MONITORING <br />0 I NOTES UST INSTALLATION <br />TOTAL: <br />1O SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN. <br />OFIBER REINFORCEMENT TO BE USED. PREMIX UNIFORMLY THROUGHOUT <br />CONCRETE. <br />OREINFORCING BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" <br />FROM SURFACE. <br />OREINFORCE CONCRETE SLAB AROUND MANHOLE WITH (4) #4 REBAR 60" <br />IN LENGTH. PLACE REBAR 6" FROM SIDES OF BOX. <br />OSINGLE 1" CONDUIT TO EACH SUBMERSIBLE PUMP. PROVIDE SEAL -OFF <br />AT SUMP & BUILDING WIRING TROUGH. CONTAINS LINE VOLTAGE WIRING. <br />ALL CONDUIT PENETRATIONS MUST BE MADE WITH ROBROY PVC COATED CONDUIT <br />ONLY. <br />ONE 1" STANDARD MONITORING HOMERUN CONDUIT TO EACH TANK. FOR <br />STANDARD MONITORING DEVICES, LOOP CONTAINMENT SUMP SENSORS, <br />PLLD, VAC SENSORS & TANK GAUGE TO TANK INTERSTITIAL SENSOR <br />OLOCATION AND HOMERUN TO BLDG. PROVIDE SEAL -OFFS IN BUILDING & <br />PRIOR TO LEAVING HAZARDOUS AREA. ROUTE TO INTRINSICALLY SAFE <br />TROUGH IN BUILDING. CONDUITS SHALL CONTAIN ONLY LOW VOLTAGE <br />WIRING FOR SENSORS. ALL CONDUIT PENETRATIONS MUST BE MADE WITH <br />ROBROY PVC COATED CONDUIT ONLY. <br />USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, MIN <br />OYa" & MAX OF 3/4" IN SIZE, FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. <br />ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER'S & OWNER'S <br />FIELD REPRESENTATIVE. <br />ASPHALT & STONE AS <br />SPECIFIED BY PROJECT <br />SPECIFICATIONS <br />SLOPE SIDES OF TANK HOLE (USE <br />OF SLOPING MUST BE RECEIVE <br />PRIOR APPROVAL ON INDIVIDUAL <br />SITE BASIC FROM "BP") OR USE <br />SHORING FOR ALL TANK <br />EXCAVATIONS IN ACCORDANCE WITH <br />OSHA 1926 SUBPART P, OSHA <br />STANDARDS - EXCAVATIONS; FINAL <br />RULE OCTOBER 1, 1989 <br />C: TYPICAL TANK ANCHORING DETAIL <br />SCALE: 1/4" = 1'-0" <br />501.31 GAL. = 1.90 CUBIC METER <br />< NOT USED. <br />VACUUM ALARM SENSORS ARE TO ACTIVATE WHEN <br />ONE OF THE FOLLOWING THREE HAPPEN: <br />A. ANY TIME LIQUID IS FOUND. (IMMEDIATE DETECTION <br />OF ANY LIQUID) <br />B. WHEN THE MERCURY FALLS BELOW 2" (1 P.S.I.) <br />C. FALLS BELOW 85 LITERS PER HOUR <br />LAYOUT TANKS & STAGE II VAPOR RECOVERY PIPING SUCH THAT THE STAGE II <br />OPIPING DRAINS & ENTERS INTO REGULAR UNLEADED TANK FIRST W/ 3" <br />CONNECTIONS, AND CONTINUES 3" TO OTHER TANKS. <br /><@>BALL VALVE ON MANIFOLD LINE TO REMAIN OPEN DURING NORMAL OPERATION. <br />NOT USED. <br />1� TO ABOVE GROUND VENT RISERS, SEE DETAIL ON SHEET G.0.6.2. <br />13 TANK PAD MINIMUM 2'-0" OFF OUTSIDE WALLS OF TANKS, AND MUST COVER THE <br />FOOTPRINT OF THE TANKS. REQUIRED TO PROVIDE FOR PROPER TANK HOLD <br />DOWN, AND TO PREVENT ACCIDENTAL DRILLING INTO TANK. <br />CUT CORNER WHERE MEETING ASPHALT PAVING ONLY. SQUARE <br />14 <br />CORNERS WHERE MEETING CONCRETE. <br /><@>DIESEL USES JUST ONE PRODUCT LINE TO DIESEL DISPENSER. <br />16 REFER TO DIESEL UST INSTALLATION DRAWING FOR STAND-ALONE UST OR AS <br />AN EXTENSION TO THIS UST DESIGN. <br />SEE SITE SPECIFIC PLANS FOR ACTUAL TANK SIZES, PLACEMENT, AND <br />ORIENTATION. FINAL SITE SPECIFIC TANK LAYOUTS SHALL BE APPROVED BY <br />THE LOCAL DISTRIBUTION TERMINAL MANAGER OR HIS AGENT. FINAL LOCATION <br />SIGN -OFF SHALL BE DOCUMENTED. <br /><@REFER TO SITE SPECIFIC PLANS FOR ACTUAL PIPE RUNS & NUMBER OF <br />>PRODUCT LINES (1 OR 2 PER UST SUMP). <br />8" THICK, 4000 PSI, <br />FIBER REINFORCED <br />CONCRETE SLAB SEE SHEET <br />G.0.2.2. FOR SPECS. EXTEND CONTINUOUS <br />FILTER FABRIC TO SLAB <br />ASPHALT AND STONE PER <br />PROJECT SPECIFICATIONS <br />16 FILTER FABRIC <br />1515 //I , - - - - - - � `N'�\ I, / <br />2' 10'-6" 3'-0" 10'-6" 2' <br />MIN. MIN. <br />3rd LIFT OF <br />PEA GRAVEL <br />oo TO TOP OF <br />TANK <br />/ <br />N 2nd LIFT OF PEA GRAVEL <br />\// ° ° °" , °• ° ° , ° ° • • °° , •° • ° ° �/ `" 1st LIFT OF PEA GRAVEL <br />• ° • • • e °° °°•• e` 1 g- Opo MIN`° ° ° ° • ° ° e •°•° e 1 o -opo MIN.. • ° �// �"� BED <br />0" MIN. J� <br />FILTER FABRIC ON 6" MAX. �I <br />18 BOTTOM & SIDES OF 18" 18" <br />TANK HOLE (WET 16 <br />HOLE ONLY) <br />NOTE: <br />ALTERNATE ANCHORING BY USE OF <br />A CONCRETE ANCHORING PAD IS <br />PERMITTED. CONSULT WITH <br />OWNER'S REPRESENTATIVE AND <br />SUCH SHALL BE INSTALLED <br />ACCORDING TO MANUFACTURER'S <br />RECOMMENDATION. <br />NOTE: <br />DEFLECTION MEASUREMENT BEFORE & AFTER <br />TANK INSTALLATION SHALL BE ACCORDING TO <br />MANUFACTURER'S REQUIREMENTS AND SHALL <br />BE WITHIN MANUFACTURER'S TOLERANCES. <br />ALL INFORMATION SHALL BE COMPLETED AS <br />PER THE MANUFACTURER'S WARRANTY <br />DOCUMENTATION. <br />MR <br />1'-0" MIN. PEA GRAVEL <br />INSTALLED OVER COMPACTED SOIL. <br />IN WET HOLE INSTALLATIONS, <br />INCREASE TO 18" MINIMUM PER <br />MANUFACTURER'S RECOMMENDED <br />INSTALLATION GUIDELINES. <br />NOTE: INDICATES ITEMS FOUND ON MATERIALS <br />XX LIST SHEETS M.5.3.01 & M.5.3.02 <br />CLIENT: <br />4: bp <br />'Ad & <br />lir <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />NO. <br />DATE <br />DESCRIPTION <br />Q04/10/2020 <br />REV. PER SJCEHD <br />Q2 <br />01/18/2021 <br />BID PACKAGE <br />Q04/01/2021 <br />REV. PER SJCEHD <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />10 <br />11 <br />0 <br />SEAL: <br />!)FESS /o <br />GHgO�� <br />NO. 36475 <br />* XP. 6-30-22 <br />ATF <br />OF- <br />z <br />Lu <br />w <br />co <br />Q <br />U <br />zoo 0 <br />z <br />z LU <br />�0cl)Tc`oo <br />00 <br />00 <br />0 <br />�d0)- <br />� Q U <br />QLLI <br />w <br />c/) Z}LL <br />I I w <br />0 O z o <br />(I II �z <br />UzOrn <br />z U U o <br />Z z <br />Q <br />p Z N <br />w z 0 <br />W <br />wQ <br />z <br />Q -- <br />C3 o U <br />p6 <br />V <br />Z � <br />w 00 w <br />Q <br />U O <br />z = <br />z 0- <br />z <br />g <br />oL <br />DEVELOPMENT INFORMATION: <br />SITE ADDRESS: <br />ADDRESS <br />2510 S. STATE HWY 99 W. FRONTAGE ROAD <br />SAN JOAQUIN COUNTY, CA 95205 <br />DESIGNED BY: <br />CHECKED BY: <br />DRAWN BY: <br />ER <br />DATE: <br />PROJECT NO: <br />10/28/2019 <br />DRAWING TITLE: <br />UST INSTALLATION <br />(1)10'0 25K AND (1) 10'0120 OK <br />BLENDING <br />DOUBLE WALL VENT AND VAPOR WITH DIESEL <br />SHEET NO: <br />M,5,3,09 <br />