Laserfiche WebLink
2 HP VARIABLE SPEED TURBINE W/ 105 10 1( <br />3 GPH ELECTRONIC LEAK DETECTION <br />W/ SIPHON PORT & SECOND 110 0 <br />VACUUM SOURCE <br />MINI HYDROSTATIC SENSOR IN 1 <br />BRINE FACTORY SUPPLIED <br />RESERVOIR <br />3" PEA GRAVEL MIN. TO a <br />PREVENT LOAD TRANSFER <br />TO TOP OF TANK <br />CONTRACTOR TO INSTALL CLEVIS AND COTTER PIN <br />TANK GAUGE ADAPTER & CAP 207 <br />VEEDER ROOT .1 GPH MAGNOSTRICTIVE 205 204 <br />PROBE TANK LEVEL PROBE W/ TLS CAP <br />& RING. OVERFILL ALARM SET @ 90% <br />CAPACITY. USE 4" FLOAT IN INSTALL KIT <br />3" D.W. FRP BONDED ENTRY FITTING 12612 <br />& 4"x3" CONCENTRIC REDUCER W/ <br />TEST PORT & PLUG <br />3" OVER 2" FIBERGLASS 148 14 <br />CROSSOVER CONTAINS <br />VACUUM TUBING ONLY FROM ? <br />FILL SUMP 12 <br />3" INSIDE 4" DOUBLE WALL 148 15 "' <br />FRP SIPHON PIPING (VACUUM 1_� <br />MONITORED) � <br />THICKEN CONCRETE SLAB TO <br />BELOW WHERE SECONDARY <br />CONTAINMENT OF SUMP ENDS. <br />45 DIA. ACCESS (TYP.). DIMENSION REQUIRED <br />SEE NOTES BELOW 10 MANHOLE VARIES WITH FIELD CONDITIONS. <br />30" I.D. 18" 1-1/2" MIN. CROWN <br />(TYP.) (NP.) (TYP. ALL OPENINGS) <br />6" WIDE DETECTABLE <br />0 UNDERGROUND MARKING <br />TAPE EMPIRE MAGNATEC <br />• • 4 ..A <br />#31-143 <br />(8" MIN. 12" MAX.) <br />217 2 -IN -1 SENSOR BOX <br />168 2" BALL VALVE (TYP.) <br />1 3 SENSOR -NO TANK VACUUM SENSOR <br />ASSEMBLY KIT W/ MOUNTING BRACKET <br />191 SEAL OFF W/ DRAIN <br />175 2"x24" FLEX (TYP.) <br />124 1" FRP BONDED ENTRY FITTING (TYP.) <br />18 1" POWER & MONITORING CONDUIT <br />(ROBROY THROUGH SUMP ONLY) <br />LOOP VACUUM TUBING TO PRODUCT CROSS CONNECT <br />PIPING AND THEN ROUTED TO VAC SENSOR <br />II <br />II 2" INSIDE 3" FIBERGLASS PIPING TO <br />DISPENSERS (VACUUM MONITORED) 14 148 <br />12612 3" D.W. FRP BONDED ENTRY FITTING <br />& 4"x3" CONCENTRIC REDUCER W/ <br />TEST PORT & VACUUM TUBING <br />LOOPED BETWEEN FITTINGS & THEN <br />ROUTED TO VAC SENSOR ASSEMBLY <br />(TYP.) <br />22" MANWAY 48" DOUBLE WALL <br />BRINE FILLED SUMP <br />NOTE: <br />SUMP LIQUID MONITORING SENSOR H ALL PRODUCT, SIPHON & CROSS CONNECTION PIPING SHALL BE <br />(IN SENSOR HOLDER BELOW APEX 0 INSTALLED SUCH THAT ALL PENETRATIONS LEAVE THE TANK SUMP <br />OF TANK AT LOWEST POINT) FROM THE SAME SIDE. SUMP SENSOR SHALL BE INSTALLED ON <br />THE SAME SIDE OF PIPING PENETRATIONS AS SHOWN <br />A: SECTION VIEW - 25K REGULAR - ONE PUMP, ONE LINE <br />SCALE: 3/4" = 1'-0" <br />3"x18" FLEX CONNECTOR <br />LOOP VACUUM TUBING TO PRODUCT CROSS -CONNECT <br />PIPING AND THEN ROUTED TO VAC SENSOR <br />VEEDER ROOT .1 GPH MAGNOSTRICTIVE 205 04 <br />THICKEN CONCRETE SLAB TO <br />o <br />FIBERGLASS <br />PROBE TANK LEVEL PROBE W/ TLS CAP <br />TANK <br />SUMP ARE MADE AND BELOW LOWEST PENETRATION <br />CONTAINMENT OF SUMP ENDS. <br />3 GPH ELECTRONIC LEAK DETECTION <br />& RING. OVERFILL ALARM SET ® 90% <br />(TYP.). DIMENSION REQUIRED <br />° <br />BETWEEN SUMPS AND SIPHON PIPING PENETRATIONS <br />40" DIA. ACCESS <br />104 VARIES WITH FIELD CONDITIONS. <br />CAPACITY. USE 4" FLOAT IN INSTALL KIT <br />I <br />MANHOLE <br />MINI HYDROSTATIC SENSOR IN BRINT�1.- <br />30" I.D. <br />3 SENSOR -NO TANK VACUUM SENSOR <br />1 <br />FACTORY SUPPLIED RESERVOI <br />(TYP.) <br />o <br />OO <br />c <br />ASSEMBLY KIT W/ MOUNTING BRACKET <br />:� <br />0 <br />UNDERGROUND MARKING <br />o <br />11 <br />o <br />2" CAP. DRILL HOLES IN END AN INSTALL/ <br />.A : •° ;.'-3 PEA GRAVELMIN. TO <br />a#31 <br />CHANNEL BONDED TO <br />143 <br />. ,. <br />PREVENT LOAD TRANSFER <br />§IRAIN <br />GROMMETS FOR TUBING PASS THROUGH 16 <br />11 <br />0 <br />o <br />3" D.W. FRP BONDED ENTRY FITTING 126 12 <br />TO INSTALL CLEVIS AND COTTER PIN <br />o� — <br />SEAL: <br />& 4"x3" CONCENTRIC REDUCER W/ <br />NK J -BOX (TYP.) 188 <br />o 0 0 <br />LEVEL PROBE W/ TLS CAP & RING. OVERFILL ALARM <br />TEST PORT & PLUG <br />0- CAUF��� <br />205 SET @ 90% CAPACITY. USE 4" FLOAT IN INSTALL <br />KIT 2 SENSOR -NO TANK VACUUM <br />LOOP VACUUM TUBING FROM <br />1 <br />SENSOR ASSEMBLY KIT W/ <br />co <br />3" OVER 2" FIBERGLASS <br />148 14 <br />MOUNTING BRACKET <br />Z <br />124 1" FRP BONDED ENTRY FITTING (TYP.) <br />CROSSOVER CONTAINS VACUUM <br />0 c1) `2 <br />1 " HOMERUN TO BLDG. TURBINE POWER <br />1" FRP BONDED ENTRY FITTING <br />TUBING ONLY FROM FILL SUMP <br />18 (ROBROY THROUGH SUMP ONLY) <br />(Typ.)124 <br />IA <br />NOTE: VACUUM MONITORING SENSOR FOR 87 OCTANE <br />" MONITORING CONDUIT <br />12 126 <br />FITTING & 4"x3" CONCENTRIC <br />PRODUCT AND CROSSCONNECT PIPING IS MOUNTED IN <br />p Z N <br />wz0-- <br />REDUCER W/ TEST PORT & PLUG <br />(ROBROY THROUGH SUMP ONLY) <br />THE 20,000 GALLON 87 OCTANE TANK'S TURBINE SUMP. <br />48" DOUBLE WALL <br />BRINE <br />VACUUM MONITORING SENSOR FOR 87 OCTANE SIPHON <br />MONITORED SUMP <br />z <br />2 0- <br />LINE IS MOUNTED IN THE 10,000 GALLON 87 OCTANE <br />CROSSOVER CONTAINS VACUUM <br />2"x24" FLEX (TYP.) 175 <br />oL <br />TANK'S TURBINE SUMP. <br />48" DOUBLE WALL BRINE FILLE�� <br />SITE ADDRESS: <br />ADDRESS <br />B: PLAN VIEW - 25K REGULAR - ONE <br />PUMP, <br />ONE LINE <br />SCALE: 3/4" = 1'-0" <br />1 <br />3/8 X 1/4 SSI <br />BUSHING <br />INSTALLED AT <br />FACTORY <br />I� <br />3" D.W. FRP BONDED ENTRY FITTING & 4"x3" <br />CONCENTRIC REDUCER W/ TEST PORT & VACUUM <br />TUBING LOOPED BETWEEN FITTINGS & THEN <br />ROUTED TO VAC SENSOR ASSEMBLY (TYP.) <br />40DISPENSERS 2 INSIDE 3" FIBERGLASS PIPING TO <br />(VACUUM MONITORED) <br />18 HOME RUN TO BUILDING VAC <br />SENSOR (ROBROY THROUGH <br />SUMP ONLY) <br />188 J -BOX (TYP.) <br />175 2"x24" FLEX (TYP.) <br />124 <br />1" FRP BONDED ENTRY FITTING <br />(TYP.) <br />18 HOME RUN TO BUILDING. TURBINE POWER <br />(ROBROY THROUGH SUMP ONLY) <br />> 10 2 HP VARIABLE SPEED TURBINE W/ <br />3 GPH ELECTRONIC LEAK DETECTION <br />0 W/ SIPHON PORT & SECOND VACUUM <br />SOURCE <br />NOTE: THE LAST 2 FEET (MINIMUM) OF CONDUITS <br />THAT ENTER THE DOUBLE WALL SUMP SHALL BE <br />PVC COATED RIGID. <br />G: DOUBLE WALL TURBINE SUMP RISER <br />SCALE: NTS <br />(8-20"X 19" FLAT PANELS) <br />_...... ---.....-- <br />FACTORY INSTALLED <br />2 HP VARIABLE SPEED TURBINE W/ <br />3 GPH ELECTRONIC LEAK DETECTION <br />W/ SIPHON PORT FOR VACUUM SOURCE <br />MINI HYDROSTATIC SENSOR IN BRINE Q <br />FACTORY SUPPLIED RESERVOIR <br />3" PEA GRAVEL MIN. TO <br />PREVENT LOAD TRANSFER <br />TO TOP OF TANK <br />SEAL OFF W/ DRAIN 191 <br />2 -IN -1 SENSOR BOX 217 <br />J -BOX (TYP.) 188 <br />2 SENSOR -NO TANK VACUUM SENSOR 1 <br />ASSEMBLY KIT W/ MOUNTING BRACKET <br />SEAL -OFF (TYP.) 191 <br />1" FRP BONDED ENTRY FITTING 124 <br />(TYP.) <br />1" MONITORING CONDUIT 18 <br />(ROUTED TO INTERSTITIAL) <br />(ROBROY THROUGH SUMP ONLY) <br />2" BALL VALVE 168 <br />48" DOUBLE WALL BRINE MONITORED <br />SUMP <br />2"x24" FLEX (TYP.) 175 <br />SUMP LIQUID MONITORING SENSOR H <br />(IN SENSOR HOLDER BELOW APEX 0 <br />OF TANK AT LOWEST POINT) <br />14 148 2 INSIDE 3" FRP PRODUCT LINE TO <br />DISPENSERS (VACUUM MONITORED) <br />SUMP LIQUID MONITORING SENSOR <br />126 12 3" D.W. FRP BONDED ENTRY FITTING (IN SENSOR HOLDER BELOW APEX <br />22 MANWAY W/ 4x3 CONCENTRIC REDUCER W/ OF TANK AT LOWEST POINT) <br />TEST PORT & VACUUM TUBING LOOPED <br />TO VAC SENSOR ASSEMBLY (TYP.) <br />NOTE: <br />SENSOR SHALL BE INSTALLED ON THE SAME SIDE OF PIPING <br />PENETRATIONS AS SHOWN <br />C: SECTION VIEW - 10K COMPARTMENT DIESEL - ONE PUMP, ONE LINE <br />SCALE: 3/4" = 1'-0" <br />2" CAP. DRILL HOLES IN END AN INSTALL <br />GROMMETS FOR TUBING PASS THROUGH 16 <br />1" MONITORING CONDUIT <br />(ROUTED TO INTERSTITIAL) 18 <br />(ROBROY THROUGH SUMP ONLY) �- <br />i <br />1 FRP BONDED ENTRY FITTING 124 <br />(TYP.) o <br />J -BOX (TYP.) 188 �/ o <br />o <br />o/ <br />0 <br />I o� <br />o� <br />22" MANWAY I� a <br />i o / <br />2 SENSOR -NO TANK VACUUM SENSOR <br />ASSEMBLY KIT W/ MOUNTING BRACKET 1 �� <br />o <br />2 HP VARIABLE SPEED TURBINE W/ 105 10 • <br />3 GPH ELECTRONIC LEAK DETECTION <br />W/ SIPHON PORT FOR VACUUM SOURCE 109 0 <br />LOOP VACUUM TUBING FROM <br />PRODUCT PIPING TO VAC SENSOR <br />2" BELLxMALE ADAPTER (TYP.) 14 <br />148 3" OVER 2" FIBERGLASS CROSSOVER <br />CONTAINS VACUUM TUBING ONLY <br />FROMFILL SUMP <br />2 126 3" D.W. FRP BONDED ENTRY <br />FITTING & 4"x3" CONCENTRIC <br />REDUCER W/ TEST PORT & PLUG <br />18 1" CONDUIT HOMERUN TO BLDG. TURBINE <br />POWER (ROBROY THROUGH SUMP ONLY) <br />1241" FRP BONDED ENTRY FITTING (TYP.) <br />204 205 VEEDER ROOT .1 GPH MAGNOSTRICTIVE <br />PROBE TANK LEVEL PROBE W/ TLS CAP <br />�I & RING. OVERFILL ALARM SET © 90% <br />CAPACITY. USE 4" FLOAT IN INSTALL KIT <br />I <br />175 2"x24" FLEX (TYP.) <br />�I <br />J 48" DOUBLE WALL BRINE <br />MONITORED SUMP <br />14 148 2 INSIDE 3" FRP PRODUCT LINE TO <br />DISPENSERS (VACUUM MONITORED) <br />3" D.W. FRP BONDED ENTRY FITTING <br />2 & 4"x3" CONCENTRIC REDUCER W/ <br />TEST PORT & VACUUM TUBING <br />LOOPED TO VAC SENSOR ASSEMBLY <br />(TYP.) <br />NOTE: THE LAST 2 FEET (MINIMUM) OF CONDUITS THAT <br />ENTER THE DOUBLE WALL SUMP SHALL BE PVC COATED <br />RIGID. <br />D: PLAN VIEW - 10K COMPARTMENT DIESEL - ONE PUMP, ONE LINE <br />SCALE: 3/4" = 1'-0" <br />*NOTE: <br />CONTRACTOR SHALL BE HELD RESPONSIBLE FOR PROPER INSTALLATION & <br />PREPARATION PER MANUFACTURERS INSTRUCTIONS AND SHALL REINSTALL <br />SUMPS IF HYDROSTATIC TESTING SHOWS LEAKING IN THIS AREA OF THE <br />SUMP. <br />SUMPS MUST BE ORIENTED SUCH THAT THE FACE OF THE SUMP PANEL IS <br />PARALLEL WITH ADJACENT TANK SUMP PANEL IN ORDER TO ACHIEVE THE 45° <br />ANGLES REQUIRED TO ROUTE THE PIPING WHILE MAINTAINING THE DESIRED <br />PERPENDICULAR ANGLE INTO THE SUMP. <br />[� CONTRACTOR TO ADDITIONALLY GLASS WRAP & LAMINATE AT CONNECTION <br />FOLLOWING CURING OF ADHESIVE. SPECIFIC ATTENTION MUST BE GIVEN TO <br />SURFACE PREP AS TESTING REQUIREMENTS WILL DETECT THE SMALLEST OF <br />FLAWS. ALL MATERIALS MUST BE COMPATIBLE WITH GASOLINE, GASOLINE <br />WITH 15% MTBE (METHYL TERTIARY -BUTYL ETHER), OR GASOLINE WITH 10% <br />ETOH (ETHANOL). FIBERGLASS AND RESIN MUST EXTEND 1/2" BEYOND <br />COVERAGE OF ADHESIVE. <br />IB <br />HICKEN CONCRETE SLAB TO <br />ELOW WHERE SECONDARY <br />ONTAINMENT OF SUMP ENDS. <br />45" DIA. ACCESS YP.). DIMENSION REQUIRED <br />10 ARIES WITH FIELD CONDITIONS. <br />SEE NOTES BELOW MANHOLE <br />30" I.D. 18" 1-1/2" MIN. CROWN <br />(TYP.) (Typ• (TYP. ALL OPENINGS) <br />6" WIDE DETECTABLE <br />UNDERGROUND MARKING <br />...°:• r :� TAPE EMPIRE MAGNATEC <br />#31-143 <br />(8" MIN. 12" MAX.) <br />L00 VACUAT TUBING FROM <br />PRODUCT PIPING TO VAC SENSOR <br />CONTRACTOR TO INSTALL CLEVIS AND COTTER PIN <br />207 TANK GAUGE ADAPTER & CAP <br />VEEDER ROOT .1 GPH MAGNOSTRICTIVE <br />04 205 PROBE TANK LEVEL PROBE W/ TLS CAP <br />& RING. OVERFILL ALARM SET @ 90% <br />CAPACITY. USE 4" FLOAT IN INSTALL KIT <br />124 1" FRP BONDED ENTRY FITTING (TYP.) <br />1" HOMERUN TO BLDG. TURBINE POWER <br />18 (ROBROY THROUGH SUMP ONLY) <br />12 126 3" D.W. FRP BONDED ENTRY <br />FITTING & 4"x3" CONCENTRIC <br />zNkREDUCER W/ TEST PORT & PLUG <br />II — ao 14 148 3" OVER 2" FIBERGLASS <br />CROSSOVER CONTAINS VACUUM <br />TUBING ONLY FROM FILL SUMP <br />L 2"INSIDE 3" FRP PRODUCT MANIFOLD <br />TO 20K TANK (VACUUM MONITORED) 00 <br />H ee3" D.W. FRP BONDED ENTRY FITTING <br />W/ 4x3 CONCENTRIC REDUCER W/ <br />TEST PORT & VACUUM TUBING LOOPED <br />TO VAC SENSOR ASSEMBLY (TYP.) <br />NOTE: <br />SENSOR SHALL BE INSTALLED ON THE SAME SIDE OF PIPING <br />PENETRATIONS AS SHOWN <br />E: SECTION VIEW - 12K COMPARTMENT PREMIUM - ONE PUMP, ONE LINE <br />SCALE: 3/4" = 1'-0" <br />2" CAP. DRILL HOLES IN END AN INSTALL <br />C16GROMMETS FOR TUBING PASS THROUGH <br />1" MONITORING CONDUIT (ROUTED <br />TO INTERSTITIAL) (ROBROY 18 <br />THROUGH SUMP ONLY) <br />1" DOUBLE ENTRY BOOT 124 <br />2 SENSOR -NO TANK VACUUM SENSOR <br />ASSEMBLY KIT W/ MOUNTING BRACKET 1 <br />2 HP VARIABLE SPEED TURBINE W/ \� • <br />105 10 <br />3 GPH ELECTRONIC LEAK DETECTION <br />W/ SIPHON PORT FOR VACUUM SOURCE 109 0 <br />14 148 3" OVER 2" FIBERGLASS CROSSOVER <br />CONTAINS VACUUM TUBING ONLY <br />FROM FILL SUMP <br />12 126 3" D.W. FRP BONDED ENTRY <br />FITTING & 4"x3" CONCENTRIC <br />REDUCER W/ TEST PORT & PLUG <br />18 1" CONDUIT HOMERUN TO BLDG. TURBINE <br />POWER (ROBROY THROUGH SUMP ONLY) <br />124 1" FRP BONDED ENTRY FITTING (TYP.) <br />VEEDER ROOT .1 GPH MAGNOSTRICTIVE <br />204 205 PROBE TANK LEVEL PROBE W/ TLS CAP <br />& RING. OVERFILL ALARM SET © 90% <br />CAPACITY. USE 4" FLOAT IN INSTALL KIT <br />175 2"x24" FLEX (TYP.) <br />48" DOUBLE WALL BRINE <br />MONITORED SUMP <br />14 148 2 INSIDE 3" FRP PRODUCT LINE TO <br />DISPENSERS (VACUUM MONITORED) <br />LOOP VACUUM TUBING FROM 12612 3" D.W. FRP BONDED ENTRY FITTING <br />PRODUCT PIPING TO VAC SENSOR & 4"x3" CONCENTRIC REDUCER W/ <br />TEST PORT & VACUUM TUBING <br />2" BELLxMALE ADAPTER (TYP.) 14 LOOPED TO VAC SENSOR ASSEMBLY <br />(TYP.) <br />NOTE: THE LAST 2 FEET (MINIMUM) OF CONDUITS THAT <br />ENTER THE DOUBLE WALL SUMP SHALL BE PVC COATED <br />RIGID. <br />F: PLAN VIEW - 12K COMPARTMENT PREMIUM - ONE PUMP, ONE LINE <br />SCALE: 3/4" = 1'-0" <br />FIBERGLASS PIPING, 2" NOMINAL, BONDED TO SUMP SUMP <br />OR UDC INNER WALL USING GASOLINE COMPATIBLE <br />EPDXY RESIN. BOTTOM OF PIPE TO BE IN CONTACT <br />WITH LOWEST PART OF SUMP OR UDC. <br />CONTRACTOR TO BOND UNISTRUT CHANNEL TO <br />HOLDER TO ALLOW FIBERGLASS PIPE TO CLEAR <br />SUMP COLLAR "LIP". CONTRACTOR TO USE <br />GASOLINE -COMPATIBLE EPDXY TO BOND SPACER TO <br />SUMP AND PIPE. CONTRACTOR MAY USE UNISTRUT, <br />FIBERGLASS PIPE, OR ANY OTHER EQUIVALENT <br />MATERIAL THAT CAN WITHSTAND ENVIRONMENT OF <br />SUMP. <br />2 WIRE <br />SHIELDED <br />CABLE <br />SUMP MONITOR LIQUID <br />SENSOR INSIDE <br />HOLDER <br />APEX OF <br />TANK <br />TURBINE SIDE SUMP SENSORS TO BE MOUNTEDJ <br />THICKEN CONCRETE SLAB TO <br />2 HP VARIABLE SPEED TURBINE W / 105 10 <br />FIBERGLASS <br />BELOW WHERE SECONDARY <br />TANK <br />SUMP ARE MADE AND BELOW LOWEST PENETRATION <br />CONTAINMENT OF SUMP ENDS. <br />3 GPH ELECTRONIC LEAK DETECTION <br />FIBERGLASS SUMP <br />(TYP.). DIMENSION REQUIRED <br />W/ SIPHON PORT FOR VACUUM SOURCE 109 0 <br />BETWEEN SUMPS AND SIPHON PIPING PENETRATIONS <br />40" DIA. ACCESS <br />104 VARIES WITH FIELD CONDITIONS. <br />ARE DESIGNED TO ENTER THE SAME SIDE OF THE UNISTRUT <br />SEE NOTES BELOW <br />MANHOLE <br />MINI HYDROSTATIC SENSOR IN BRINT�1.- <br />30" I.D. <br />18 1-1/2" MIN. CROWN <br />FACTORY SUPPLIED RESERVOI <br />(TYP.) <br />TYP. (TYP. ALL OPENINGS) <br />CHANNEL <br />SUMP WILL BE REQUIRED TO BE INSTALLED. <br />6 WIDE DETECTABLE°p <br />:� <br />0 <br />UNDERGROUND MARKING <br />:TAPE <br />0 <br />EMPIRE MAGNATEC <br />.A : •° ;.'-3 PEA GRAVELMIN. TO <br />a#31 <br />CHANNEL BONDED TO <br />143 <br />. ,. <br />PREVENT LOAD TRANSFER <br />§IRAIN <br />io <br />(8 MIN. 12 MAX.) <br />TO TOP OF TANK <br />207 TANK GAUGE ADAPTER &CAPSEAL <br />OFF W/ DCONTRACTOR <br />TO INSTALL CLEVIS AND COTTER PIN <br />2 -IN -1 SE217 <br />SEAL: <br />VEEDER ROOT .1 GPH MAGNOSTRICTIVE PROBE T <br />04 <br />NK J -BOX (TYP.) 188 <br />NO. 36475 <br />LEVEL PROBE W/ TLS CAP & RING. OVERFILL ALARM <br />ATF <br />0- CAUF��� <br />205 SET @ 90% CAPACITY. USE 4" FLOAT IN INSTALL <br />KIT 2 SENSOR -NO TANK VACUUM <br />LOOP VACUUM TUBING FROM <br />1 <br />SENSOR ASSEMBLY KIT W/ <br />co <br />PRODUCT PIPING TO VAC SENSOR <br />MOUNTING BRACKET <br />Z <br />124 1" FRP BONDED ENTRY FITTING (TYP.) <br />SEAL -OFF (TYP.) 191 <br />0 c1) `2 <br />1 " HOMERUN TO BLDG. TURBINE POWER <br />1" FRP BONDED ENTRY FITTING <br />cc <br />18 (ROBROY THROUGH SUMP ONLY) <br />(Typ.)124 <br />IA <br />3" D.W. FRP BONDED ENTRY <br />" MONITORING CONDUIT <br />12 126 <br />FITTING & 4"x3" CONCENTRIC <br />(1 <br />ROUTED TO INTERSTITIAL 18 <br />p Z N <br />wz0-- <br />REDUCER W/ TEST PORT & PLUG <br />(ROBROY THROUGH SUMP ONLY) <br />06 <br />Z.t <br />� <br />w 00 w <br />2" BALL VALVE 168 <br />0 z <br />0 <br />— 14 148 3" OVER 2" FIBERGLASS <br />z <br />2 0- <br />II <br />CROSSOVER CONTAINS VACUUM <br />2"x24" FLEX (TYP.) 175 <br />oL <br />TUBING ONLY FROM FILL SUMP <br />48" DOUBLE WALL BRINE FILLE�� <br />SITE ADDRESS: <br />ADDRESS <br />SUMP _r <br />14 148 2 INSIDE 3" FRP PRODUCT LINE TO <br />DISPENSERS (VACUUM MONITORED) <br />SUMP LIQUID MONITORING SENSOR <br />126 12 3" D.W. FRP BONDED ENTRY FITTING (IN SENSOR HOLDER BELOW APEX <br />22 MANWAY W/ 4x3 CONCENTRIC REDUCER W/ OF TANK AT LOWEST POINT) <br />TEST PORT & VACUUM TUBING LOOPED <br />TO VAC SENSOR ASSEMBLY (TYP.) <br />NOTE: <br />SENSOR SHALL BE INSTALLED ON THE SAME SIDE OF PIPING <br />PENETRATIONS AS SHOWN <br />C: SECTION VIEW - 10K COMPARTMENT DIESEL - ONE PUMP, ONE LINE <br />SCALE: 3/4" = 1'-0" <br />2" CAP. DRILL HOLES IN END AN INSTALL <br />GROMMETS FOR TUBING PASS THROUGH 16 <br />1" MONITORING CONDUIT <br />(ROUTED TO INTERSTITIAL) 18 <br />(ROBROY THROUGH SUMP ONLY) �- <br />i <br />1 FRP BONDED ENTRY FITTING 124 <br />(TYP.) o <br />J -BOX (TYP.) 188 �/ o <br />o <br />o/ <br />0 <br />I o� <br />o� <br />22" MANWAY I� a <br />i o / <br />2 SENSOR -NO TANK VACUUM SENSOR <br />ASSEMBLY KIT W/ MOUNTING BRACKET 1 �� <br />o <br />2 HP VARIABLE SPEED TURBINE W/ 105 10 • <br />3 GPH ELECTRONIC LEAK DETECTION <br />W/ SIPHON PORT FOR VACUUM SOURCE 109 0 <br />LOOP VACUUM TUBING FROM <br />PRODUCT PIPING TO VAC SENSOR <br />2" BELLxMALE ADAPTER (TYP.) 14 <br />148 3" OVER 2" FIBERGLASS CROSSOVER <br />CONTAINS VACUUM TUBING ONLY <br />FROMFILL SUMP <br />2 126 3" D.W. FRP BONDED ENTRY <br />FITTING & 4"x3" CONCENTRIC <br />REDUCER W/ TEST PORT & PLUG <br />18 1" CONDUIT HOMERUN TO BLDG. TURBINE <br />POWER (ROBROY THROUGH SUMP ONLY) <br />1241" FRP BONDED ENTRY FITTING (TYP.) <br />204 205 VEEDER ROOT .1 GPH MAGNOSTRICTIVE <br />PROBE TANK LEVEL PROBE W/ TLS CAP <br />�I & RING. OVERFILL ALARM SET © 90% <br />CAPACITY. USE 4" FLOAT IN INSTALL KIT <br />I <br />175 2"x24" FLEX (TYP.) <br />�I <br />J 48" DOUBLE WALL BRINE <br />MONITORED SUMP <br />14 148 2 INSIDE 3" FRP PRODUCT LINE TO <br />DISPENSERS (VACUUM MONITORED) <br />3" D.W. FRP BONDED ENTRY FITTING <br />2 & 4"x3" CONCENTRIC REDUCER W/ <br />TEST PORT & VACUUM TUBING <br />LOOPED TO VAC SENSOR ASSEMBLY <br />(TYP.) <br />NOTE: THE LAST 2 FEET (MINIMUM) OF CONDUITS THAT <br />ENTER THE DOUBLE WALL SUMP SHALL BE PVC COATED <br />RIGID. <br />D: PLAN VIEW - 10K COMPARTMENT DIESEL - ONE PUMP, ONE LINE <br />SCALE: 3/4" = 1'-0" <br />*NOTE: <br />CONTRACTOR SHALL BE HELD RESPONSIBLE FOR PROPER INSTALLATION & <br />PREPARATION PER MANUFACTURERS INSTRUCTIONS AND SHALL REINSTALL <br />SUMPS IF HYDROSTATIC TESTING SHOWS LEAKING IN THIS AREA OF THE <br />SUMP. <br />SUMPS MUST BE ORIENTED SUCH THAT THE FACE OF THE SUMP PANEL IS <br />PARALLEL WITH ADJACENT TANK SUMP PANEL IN ORDER TO ACHIEVE THE 45° <br />ANGLES REQUIRED TO ROUTE THE PIPING WHILE MAINTAINING THE DESIRED <br />PERPENDICULAR ANGLE INTO THE SUMP. <br />[� CONTRACTOR TO ADDITIONALLY GLASS WRAP & LAMINATE AT CONNECTION <br />FOLLOWING CURING OF ADHESIVE. SPECIFIC ATTENTION MUST BE GIVEN TO <br />SURFACE PREP AS TESTING REQUIREMENTS WILL DETECT THE SMALLEST OF <br />FLAWS. ALL MATERIALS MUST BE COMPATIBLE WITH GASOLINE, GASOLINE <br />WITH 15% MTBE (METHYL TERTIARY -BUTYL ETHER), OR GASOLINE WITH 10% <br />ETOH (ETHANOL). FIBERGLASS AND RESIN MUST EXTEND 1/2" BEYOND <br />COVERAGE OF ADHESIVE. <br />IB <br />HICKEN CONCRETE SLAB TO <br />ELOW WHERE SECONDARY <br />ONTAINMENT OF SUMP ENDS. <br />45" DIA. ACCESS YP.). DIMENSION REQUIRED <br />10 ARIES WITH FIELD CONDITIONS. <br />SEE NOTES BELOW MANHOLE <br />30" I.D. 18" 1-1/2" MIN. CROWN <br />(TYP.) (Typ• (TYP. ALL OPENINGS) <br />6" WIDE DETECTABLE <br />UNDERGROUND MARKING <br />...°:• r :� TAPE EMPIRE MAGNATEC <br />#31-143 <br />(8" MIN. 12" MAX.) <br />L00 VACUAT TUBING FROM <br />PRODUCT PIPING TO VAC SENSOR <br />CONTRACTOR TO INSTALL CLEVIS AND COTTER PIN <br />207 TANK GAUGE ADAPTER & CAP <br />VEEDER ROOT .1 GPH MAGNOSTRICTIVE <br />04 205 PROBE TANK LEVEL PROBE W/ TLS CAP <br />& RING. OVERFILL ALARM SET @ 90% <br />CAPACITY. USE 4" FLOAT IN INSTALL KIT <br />124 1" FRP BONDED ENTRY FITTING (TYP.) <br />1" HOMERUN TO BLDG. TURBINE POWER <br />18 (ROBROY THROUGH SUMP ONLY) <br />12 126 3" D.W. FRP BONDED ENTRY <br />FITTING & 4"x3" CONCENTRIC <br />zNkREDUCER W/ TEST PORT & PLUG <br />II — ao 14 148 3" OVER 2" FIBERGLASS <br />CROSSOVER CONTAINS VACUUM <br />TUBING ONLY FROM FILL SUMP <br />L 2"INSIDE 3" FRP PRODUCT MANIFOLD <br />TO 20K TANK (VACUUM MONITORED) 00 <br />H ee3" D.W. FRP BONDED ENTRY FITTING <br />W/ 4x3 CONCENTRIC REDUCER W/ <br />TEST PORT & VACUUM TUBING LOOPED <br />TO VAC SENSOR ASSEMBLY (TYP.) <br />NOTE: <br />SENSOR SHALL BE INSTALLED ON THE SAME SIDE OF PIPING <br />PENETRATIONS AS SHOWN <br />E: SECTION VIEW - 12K COMPARTMENT PREMIUM - ONE PUMP, ONE LINE <br />SCALE: 3/4" = 1'-0" <br />2" CAP. DRILL HOLES IN END AN INSTALL <br />C16GROMMETS FOR TUBING PASS THROUGH <br />1" MONITORING CONDUIT (ROUTED <br />TO INTERSTITIAL) (ROBROY 18 <br />THROUGH SUMP ONLY) <br />1" DOUBLE ENTRY BOOT 124 <br />2 SENSOR -NO TANK VACUUM SENSOR <br />ASSEMBLY KIT W/ MOUNTING BRACKET 1 <br />2 HP VARIABLE SPEED TURBINE W/ \� • <br />105 10 <br />3 GPH ELECTRONIC LEAK DETECTION <br />W/ SIPHON PORT FOR VACUUM SOURCE 109 0 <br />14 148 3" OVER 2" FIBERGLASS CROSSOVER <br />CONTAINS VACUUM TUBING ONLY <br />FROM FILL SUMP <br />12 126 3" D.W. FRP BONDED ENTRY <br />FITTING & 4"x3" CONCENTRIC <br />REDUCER W/ TEST PORT & PLUG <br />18 1" CONDUIT HOMERUN TO BLDG. TURBINE <br />POWER (ROBROY THROUGH SUMP ONLY) <br />124 1" FRP BONDED ENTRY FITTING (TYP.) <br />VEEDER ROOT .1 GPH MAGNOSTRICTIVE <br />204 205 PROBE TANK LEVEL PROBE W/ TLS CAP <br />& RING. OVERFILL ALARM SET © 90% <br />CAPACITY. USE 4" FLOAT IN INSTALL KIT <br />175 2"x24" FLEX (TYP.) <br />48" DOUBLE WALL BRINE <br />MONITORED SUMP <br />14 148 2 INSIDE 3" FRP PRODUCT LINE TO <br />DISPENSERS (VACUUM MONITORED) <br />LOOP VACUUM TUBING FROM 12612 3" D.W. FRP BONDED ENTRY FITTING <br />PRODUCT PIPING TO VAC SENSOR & 4"x3" CONCENTRIC REDUCER W/ <br />TEST PORT & VACUUM TUBING <br />2" BELLxMALE ADAPTER (TYP.) 14 LOOPED TO VAC SENSOR ASSEMBLY <br />(TYP.) <br />NOTE: THE LAST 2 FEET (MINIMUM) OF CONDUITS THAT <br />ENTER THE DOUBLE WALL SUMP SHALL BE PVC COATED <br />RIGID. <br />F: PLAN VIEW - 12K COMPARTMENT PREMIUM - ONE PUMP, ONE LINE <br />SCALE: 3/4" = 1'-0" <br />FIBERGLASS PIPING, 2" NOMINAL, BONDED TO SUMP SUMP <br />OR UDC INNER WALL USING GASOLINE COMPATIBLE <br />EPDXY RESIN. BOTTOM OF PIPE TO BE IN CONTACT <br />WITH LOWEST PART OF SUMP OR UDC. <br />CONTRACTOR TO BOND UNISTRUT CHANNEL TO <br />HOLDER TO ALLOW FIBERGLASS PIPE TO CLEAR <br />SUMP COLLAR "LIP". CONTRACTOR TO USE <br />GASOLINE -COMPATIBLE EPDXY TO BOND SPACER TO <br />SUMP AND PIPE. CONTRACTOR MAY USE UNISTRUT, <br />FIBERGLASS PIPE, OR ANY OTHER EQUIVALENT <br />MATERIAL THAT CAN WITHSTAND ENVIRONMENT OF <br />SUMP. <br />2 WIRE <br />SHIELDED <br />CABLE <br />SUMP MONITOR LIQUID <br />SENSOR INSIDE <br />HOLDER <br />APEX OF <br />TANK <br />TURBINE SIDE SUMP SENSORS TO BE MOUNTEDJ <br />I <br />BELOW APEX OF TANK, AT BOTTOM OF SUMP AT <br />FIBERGLASS <br />SIDE OF TANK WHERE PRODUCT PENETRATIONS INTO <br />TANK <br />SUMP ARE MADE AND BELOW LOWEST PENETRATION <br />DATE <br />FITTING WITHIN SUMP AREA. PRODUCT PIPING TO <br />FIBERGLASS SUMP <br />DISPENSERS, PRODUCT PIPING CROSS CONNECTION <br />INSIDE TANK COLLAR <br />BETWEEN SUMPS AND SIPHON PIPING PENETRATIONS <br />LIP <br />ARE DESIGNED TO ENTER THE SAME SIDE OF THE UNISTRUT <br />1. SENSOR HOLDER <br />SUMP AS SHOWN. IF PRODUCT PENETRATION CHANNEL <br />BONDED TO UNISTRUT <br />ENTERS ON BOTH SIDES OF SUMP DUE TO FIELD <br />CONDITIONS, THEN DUAL SENSORS AT TURBINE <br />CHANNEL <br />SUMP WILL BE REQUIRED TO BE INSTALLED. <br />0 <br />2. SENSOR HOLDER <br />0 <br />AND UNISTRUT <br />CHANNEL BONDED TO <br />SUMP WALL. DO NOT <br />io <br />PENETRATE SUMP! <br />H: SUMP SENSOR HOLDER DETAILS <br />SCALE: 1" = 1'-0" <br />NOTE: CONTRACTOR TO USE ADDITIONAL <br />GALVANIZED FITTINGS AS REQUIRED TO <br />MINIMIZE BENDS IN FLEXIBLE CONNECTORS <br />NOTE: INDICATES ITEMS FOUND ON <br />XX MATERIALS LIST SHEETS M.5.3.01 & M.5.3.02 <br />CLIENT: <br />4: bp <br />'Ad & <br />lir <br />ARCO <br />BP WEST COAST PRODUCTS, LLC <br />NO. <br />DATE <br />DESCRIPTION <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />io <br />SEAL: <br />FESS /0 <br />Of-�gp�l <br />NO. 36475 <br />* XP. 6-30-22 <br />ATF <br />0- CAUF��� <br />z <br />Lu <br />w <br />.Q <br />co <br />Uzoo <br />0 <br />Z <br />z~�� <br />� <br />0 c1) `2 <br />mZ <br />0 <br />c)dc, <br />=) Q U <br />cc <br />Qw <br />I I w w <br />c/'z}LL <br />0 O z o <br />co <br />zUUo <br />zz <br />Q <br />p Z N <br />wz0-- <br />�LU <br />wQ}Z� <br />z Q -- <br />06 <br />Z.t <br />� <br />w 00 w <br />Q <br />0 z <br />0 <br />z <br />2 0- <br />z <br />g <br />oL <br />DEVELOPMENT INFORMATION: <br />SITE ADDRESS: <br />ADDRESS <br />2510 S. STATE HWY 99 W. FRONTAGE ROAD <br />SAN JOAQUIN COUNTY, CA 95205 <br />DESIGNED BY: <br />CHECKED BY: <br />DRAWN BY: <br />ER <br />DATE: <br />PROJECT NO: <br />10/24/2019 <br />DRAWING TITLE: <br />TURBINE SIDE SUMPS AND PIPING <br />INSTALLATION DETAILS <br />(SINGLE 2HP TURBINE, 2022 <br />CONFIGURATION D.W. VENT/VAPOR) <br />SHEET NO: <br />M,5,3,13 <br />