Laserfiche WebLink
2 3 4 5 <br /> a <br /> _L3 <br /> 0 <br /> m <br /> 0 <br /> N <br /> O <br /> N <br /> L <br /> FIXTURE AND SPECIALTIES PLUMBING SCHEDULE ( SEE COMPREHENSIVE EQUIPMENT SCHEDULE ON SHEET EQ 2) <br /> 0 <br /> U <br /> MARK DESCRIPTION SUPPLIED BY INSTALLED BY MANUFACTURER MODEL # DESCRIPTION CONNECTIONS REMARKS <br /> WASTE VENT H.W. C.W. <br /> P-4 LAVATORY MILLWORK VENDOR G.C. PLUMBER CORIAN 8254-GLACIER WHITE RECTANGULAR UNDER-MOUNT LAVATORY 1-1/4" 1-1/4" 1/2" 1/2" -- <br /> FAUCET G.C. PLUMBER G.C. PLUMBER SLOAN EAF-275-SOL-ISM-SF-0.5GPM-AER-IR-IQ-FCT OPTIMA SENSOR FAUCET-SOLAR POWER SUPPLY, INTEGRATED SIDE MIXER, BRUSHED STAINLESS FINISH, 0.5GPM, AERATED SPRAY, INFRARED SENSOR, OPTIMA SOLAR POWERED DECK-MOUNTED MID BODY FAUCET. - - - - -- <br /> SUPPLIES G.C. PLUMBER G.C. PLUMBER -- -- CHROME PLATED ANGLE STOPS WITH WHEEL HANDLE, CHROME PLATED FLEXIBLE BRASS RISER, INSULATE ALL EXPOSED WATER LINES AND VALVES. - - - - -- <br /> WASTE G.C. PLUMBER G.C. PLUMBER SPEAKMAN S-3440 GRID DRAIN STRAINER, 1-1/4" TAILPIECE, 1-1/4" 17 GAUGE CHROME PLATED ADJUSTABLE BRASS P-TRAP WITH CLEANOUT PLUG, 1-1/4" CHROME PLATED BRASS WASTE TO WALL. - - - - -- <br /> H11 <br /> ENGINEERS <br /> Engineering Firm : F-21834 <br /> GHC Engineers, LLC <br /> GENERAL NOTES PIPING MATERIALS LEGEND 14901 Quorum Dr, Ste 300Dallas, Texas 75254 <br /> SEWERBELOW GRADE SCHEDULE 40 PVC Office: 972-239-8884 <br /> 1. VERIFY EXACT LOCATIONS, ELEVATIONS AND CHARACTERISTICS OF UTILITIES AND PIPING BEFORE gclaussen@ghcengineers.com <br /> COMMENCEMENT OF WORK, AND IMMEDIATELY NOTIFY THE ARCHITECT OF ANY DISCREPANCIES. WASTE VENT ABOVE GRADE SCHEDULE 40 PVC <br /> 2. OBTAIN EXACT LOCATIONS AND MOUNTING HEIGHTS OF PLUMBING FIXTURES AND KITCHEN EQUIPMENT COLD & HOT WATER (ABOVE GROUND) TYPE 'L' COPPER OR PEX Project#G210418.001 <br /> FROM ARCHITECTURAL AND KITCHEN EQUIPMENT DRAWINGS. COLD WATER (BURIED) TYPE 'K' COPPER OR PEX CERTIFICATION <br /> 3. CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH UTILITY COMPANIES FOR SERVICE AND CONNECTIONS <br /> AND SHALL PAY FOR ALL PERMITS. FEES, CHARGES AND METERS. GAS (ON ROOF & INSIDE BUILDING) SCHEDULE 40 BLACK IRON <br /> 4. PLUMBING CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR FLOOR SINKS AND FLOOR CONDENSATE DRAIN TYPE 'M' COPPER <br /> DRAINS. THE GOVERNING AUTHORITY HAVING JURISDICTION MAY REQUIRE THE FOLLOWING: FLOOR SINKS INDIRECT DRAIN (INSIDE BUILDING) DWV COPPER QRpFESS/p <br /> MAY BE REQUIRED TO BE INSTALLED WITH THE RIM RAISED ABOVE THE FINISHED FLOOR. FLOOR DRAINS O �9l <br /> ED <br /> MAY NEED TO BE RECESSED WITH THE FLOOR SLOPED TO THE DRAIN. THE PLUMBING CONTRACTOR NOTE: REFER TO PROJECT SPECIFICATION MANUAL. X00 R� <br /> SHALL BE RESPONSIBLE FOR OBTAINING THIS INFORMATION AND INSTALLING THESE ITEMS AS REQUIRED 2 <br /> BY CODE. w 4274 m <br /> 5. INSTALL ALL PLUMBING TO AVOID INTERFERENCE WITH ELECTRICAL AND MECHANICAL EQUIPMENT AND * EXp 12.31.22 <br /> STRUCTURAL FRAMING. NO WATER OR DRAIN LINES PERMITTED OVER OR UNDER ELECTRICAL PANELS. <br /> ENSURE THAT ALL WATER LINES INSIDE WALLS ARE ADEQUATELY SECURED. PIPE HANGER SPACING SCHEDULE (9 �FCHAWr-P�. .P <br /> 6. PROVIDE TRAPS, STOPS, GATE VALVES, GAS COCKS, WATER HAMMER ARRESTERS, VACUUM BREAKERS ON gTFOFOq�\FO�� <br /> THREADED FAUCETS, WALL CLEANOUTS, CLEANOUT COVERS, FLEX CONNECTIONS, SHUT-OFF VALVES AND MAXIMUM HORIZONTAL MAXIMUM VERTICAL <br /> INDIRECT WASTE TO AN APPROVED RECEPTOR AND ALL NECESSARY TRIM FOR A COMPLETELY INSTALLED PIPING MATERIAL SPACING (FEET) SPACING (FEET) 0 4 .2 6 .21 <br /> & CONNECTED PLUMBING SYSTEM. <br /> 7. RECORD ON AS-BUILT DRAWINGS, ALL SIZES, LOCATIONS. INVERTS AND MATERIALS OF EXISTING PIPES SCHEDULE 40 PVC 4 1Q1 <br /> THAT ARE ENCOUNTERED AND NEW PIPES INSTALLED DURING THE COURSE OF THE PROJECT DELIVER SCHEDULE 40 BLACK IRON 12 15 <br /> AS—BUILTS TO THE CONSTRUCTION MANAGER AT THE END OF THE PROJECT. PEX 2.67 101 <br /> 8. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL LOCAL AND FEDERAL CODES, RULES AND COPPER OR COPPER—ALLOY PIPE 12 10 REGISTRATION NUMBER <br /> REGULATIONS GOVERNING THIS PROJECT. C017261 <br /> 9. UPON COMPLETION OF JOB, INSPECT ALL EXPOSED PORTIONS OF THE PLUMBING INSTALLATIONS AND a. THE MAXIMUM HORIZONTAL SPACING OF CAST—IRON PIPE HANGERS SHALL BE INCREASED TO 10 FEET <br /> COMPLETELY REMOVE ALL EXPOSED LABELS, SOIL, MARKINGS, AND FOREIGN MATERIAL EXCEPT PRODUCT WHERE 10—FOOT LENGTHS OF PIPE ARE INSTALLED. EXP DATE <br /> LABELS AND THOSE REQUIRED BY LAW. b. FOR SIZES 2 INCHES AND SMALLER, A GUIDE SHALL BE INSTALLED MIDWAY BETWEEN REQUIRED VERTICAL <br /> 10.TERMINATE ALL INDIRECT WASTE LINES ABOVE FLOOR SINK WITH 1" (MIN.) AIR GAP. ALL INDIRECT SUPPORTS. SUCH GUIDES SHALL PREVENT PIPE MOVEMENT IN A DIRECTION PERPENDICULAR TO THE AXIS OF 12.31.22 <br /> WASTE PIPING MUST BE HARD PIPED, COPPER ONLY. NO P.V.C. ALLOWED. THE PIPE. PROJECT NUMBER <br /> II.PROVIDE FLEXIBLE GAS CONNECTIONS TO WATER HEATER AND COOKING EQUIPMENT. PROVIDE RIGID FROM THE INTERNATIONAL PLUMBING CODE TABLE 308.5 200772 <br /> GAS CONNECTIONS TO ALL OTHER EQUIPMENT AND APPLIANCES AND WHERE LOCAL JURISDICTION <br /> PROHIBITS THE USE OF FLEXIBLE CONNECTIONS. <br /> 12.VFRIFY ALL EQUIPMENT AND APPLIANCE CONNECTION SIZES PRIOR TO MAKING FINAL CONNECTION. <br /> REDUCE BRANCH PIPE SIZING JUST PRIOR TO CONNECTION TO UNIT. <br /> W <br /> U) 0_ <br /> O <br /> (D J <br /> J <br /> LL <br /> Z <br /> O <br /> N <br /> O <br /> N <br /> J <br /> 0Q 0 p <br /> 10�JUw <br /> _JJa w <br /> J V U <br /> Q Q <br /> O Q o <br /> H z z <br /> Cn (-0 W w <br /> J WN ~ <br /> w <br /> Q CO <br /> LL w <br /> 0 <br /> LL <br /> J <br /> W <br /> M O <br /> W w <br /> .a <br /> MU <br /> �& 0 <br /> 9 D <br /> 3 GLENLAKE PARKWAY NE <br /> BWW DESIGN TEAM <br /> ATLANTA, GA 30328 <br /> PHONE 678.514.4100 <br /> N <br /> W O <br /> � N <br /> p N <br /> 0 <br /> W <br /> Z) <br /> �U) <br /> /1 <br /> 11 z <br /> `J O_ <br /> Z ~ <br /> a_ <br /> U) <br /> W <br /> W <br /> W <br /> W <br /> 0 a- <br /> 0 O <br /> LL <br /> W <br /> Z) <br /> U) <br /> Z - N CO It LO CO <br /> Drawing Title <br /> PLUMBING <br /> SCHEDULES & <br /> RISERS <br /> N <br /> ® P401 <br />