Laserfiche WebLink
Type of Action <br />CERS ID <br />UNDERGROUND STORAGE TANK <br />OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 9 of fl <br />❑ Installation Inspection Repair Inspection ❑ 36 Month Inspection <br />I. FACILITY INFORMATION <br />Date of Overfill Prevention Equipment Inspection <br />1/16/2019 <br />Business Name (Same as Facifity Name or DBA -Doing Business As) <br />Escalon Mini Mart <br />Business Site Address City <br />1097 E. Yosemite Ave.. Escalon <br />II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br />Name of UST Service 1 hniclan Performing the Inspection (Print as shown on the !CC certification.) Phoner209� 537-9396 <br />Miguel Zaragoza ll <br />Contractor 1 Tank Tester Li Certificaiton Expiration Date <br />8/4/2099 <br />Overfill Prevention Equit <br />OPW #175405 <br />Inspection Method <br />Used: <br />License <br />95320 <br /># ICC Certification # ICC <br />8296444 <br />nt Inspection Training and Certifications (List applicable certifications.) <br />Franklin Fueling #2996953702 <br />Ill. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br />❑x Manufacturer Guidelines (Specify): <br />❑ Industry Code or Engineering Standard (Specify): <br />❑ Engineered Method (Specify): <br />Afiarh the inspection procedures and all documentation required to determine the results. I # of <br />TANK ID: fBy tank number, stored product, etc.) <br />91 <br />What is the tank inside diameter? (inches) <br />1 11 <br />Is the fill piping secondarily contained? <br />❑ Yesx❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />Is the vent piping secondarily contained? <br />❑ Yes El No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />Overfill Prevention Equipment Manufacturer(s) <br />Phil Tite - Franklin <br />Defender Series <br />What is the overfill prevention equipment response <br />❑ Shuts Off Flow <br />❑ Shuts Off Flow <br />❑ Shuts Off Flow <br />EJ Shuts Off Flow <br />when activated? <br />❑x Restricts Flow <br />❑ Restricts Flow <br />❑ Restricts Flow <br />❑Restricts Flow <br />(Check all that apply.) <br />❑ AN Alarm <br />❑ AN Alarm <br />❑ AN Alarm <br />❑ AN Alarm <br />Are flow restrkctors installed on vent piping? <br />❑ Yes l] No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />At what level in the tank is the overfill prevention set <br />100 1/8 <br />to activate? finches from bottom of tank.) <br />What is the percent capacity of the tank at which the <br />o <br />95 �o <br />overfill prevention equipment activates? <br />Is the overfill prevention in proper operating condition <br />ElYes <br />D Yes <br />❑ Yes <br />❑ Yes <br />to respond when the substance reaches the <br />❑ No (Specify in V.) <br />❑ No (Specify in V.) <br />❑ No (Specify in V} <br />❑ No fSpecify in V.} <br />annrooriate levet? <br />Overfill Prevention <br />IV. SUMMARY OF INSPECTION RESULTS <br />Results Q Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />V. COMMENTS <br />items marked "Fall" must be explained in this section Any additional comments may also be provided here. <br />VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br />I hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations, Title 23, <br />Division 3, Chapter 16, Section 2637.2 an all the information contained herein is accurate. <br />UST Service Technician Signature fp LOP I <br />If the facilifyhas more components fhan this form ac—coV oda s, a ditional copies of this page maybe attached. <br />CERS = Catfornia Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AIV = Audible and Visual <br />