Laserfiche WebLink
-2-PA-2100195 (SA) 3) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable at the time of building permit application. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) 4) The Regional Transportation Impact Fee shall be required for this application. The fee is due and payable at the time of building permit application. The fee will be based on the current schedule at the time of payment. (Resolution R-06-38) 5) The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due and payable prior to issuance of the building permit. The fee will be based on the current schedule at the time of payment. (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) 6) A copy of the Final Site Plan shall be submitted prior to release of building permit. 7) This project is a NPDES Phase I regulated area and shall comply with the following conditions. Prior to release of the building permit, plans and calculations shall be submitted and approved by the Public Works Department -Water Resources Division (209-468-9360): a) Treatment: A registered professional engineer shall design the site to treat the 85th percentile storm as defined in the County's 2021 Storm Water Quality Control Criteria Plan (SWQCCP). b) Hydromodification: A registered professional engineer shall design the site to comply with the volume reduction requirement outlined in the County's 2021 SWQCCP. c) Trash: A registered professional engineer shall design the site to comply with the trash control requirement outlined in the County's 2021 SWQCCP. 8) Prior to release of the building perniit the applicant shall submit the Storm Water Pollution Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all required records, updates, test results and inspection reports shall be maintained on the construction site and be available for review upon request. 9) Prior to release of the building permit, the owner shall enter into an agreement with San Joaquin County for post-construction maintenance of stormwater quality facilities. AC:CH