My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
229
>
1600 - Food Program
>
PR0160836
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 8:22:19 AM
Creation date
12/9/2021 7:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0160836
PE
1632
FACILITY_ID
FA0000786
FACILITY_NAME
GOSPEL RESCUE MISSION CAFETERI
STREET_NUMBER
229
Direction
E
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14906619
CURRENT_STATUS
01
SITE_LOCATION
229 E CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Process Systems Process Systems FTM Process Systems <br /> NRCC-PRC-E(Created 01/21) CALIFORNIA ENERGY COMMISSION NRCC-PRC-E(Created 01/21) CALIFORNIA ENERGY COMMISSION 1J. NRCC-PRC-E(Created 01/21) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-PRC-E CERTIFICATE OF COMPLIANCE NRCC-PRC-E CERTIFICATE OF COMPLIANCE NRCC-PRC-E <br /> Table Instructions:Include any process systems that are within the scope of the permit application and are demonstrating compliance with mandatory requirements in 120.6 or Table Instructions:Include any process systems that are within the scope of the permit application and are demonstrating compliance with mandatory requirements in 120.6 or Table Instructions:include any process systems that are within the scope of the permit application and are demonstrating compliance with mandatory requirements in 120.6 or <br /> prescriptive requirements in IL40.9.This compliance document is used for newly constructed,addition and alteration projects. prescriptive requirements in 140.9.This compliance document is used for newly constructed,addition and alteration projects. prescriptive requirements in 140.9.This compliance document is used for newly constructed,addition and alteration projects. <br /> Project Name: Gospel Center Rescue Mission Kitchen Remodel IReport Page: Page 1 of 6 Project Name: Gospel Center Rescue Mission Kitchen Remodel lReport Page: Page 2 of 6 Project Name: Gospel Center Rescue Mission Kitchen Remodel IReport Page: Page 3 of 6 <br /> Project Address: 445 S San Joaquin St.Stockton CA 95203 JDate Prepared: 2021-03-05 Project Address: 445 5 San Joaquin St.Stockton CA 95203 jDate Prepared: 2021-03-05 Project Address: 445 S San Joaquin St.Stockton CA 95203 IDate Prepared: 2021-03-05 <br /> A.GENERAL INFORMATION D.EXCEPTIONAL CONDITIONS M.COMPUTER ROOM SYSTEM SUMMARY 0 <br /> 01 Project Location(city) Stockton 04 Total Conditioned Floor Area 2,048 This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. This Section Does Not Apply \ l� /n A <br /> 02 Climate Zone 12 05 Total Unconditioned Floor Area No exceptional conditions apply to this project. v v I V <br /> 03 Occupancy Types Within Project: 1 06 1#of Stories(Habitable Above Grade) 1 N.COMMERCIAL KITCHEN EXHAUST AND VENTILATION [J <br /> ❑Office ❑ Retail ❑ Non-refrigerated Warehouse Table Instructions:Complete the following table to demonstrate compliance with prescriptive requirements found in§140.9(b). Requirements only apply to new hoods or ARCHITECTS <br /> E.ADDITIONAL REMARKS replacement hoods being installed as art o thepermitted scope. Existing hoods not being replaced,or an hoods within a healthcare facility do not need to meet requirements. <br /> Hotel/Motel �School � Healthcare Facility U P 9 p f P P 9 9 P Y f Y q <br /> High-Rise Residential Relocatable Class Bldg Q Other(Write In): Kitchen This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. Kitchen Ventilation§140.9(b)2 <br /> 01 lExisting kitchen hoods not being replaced as part of an addition or alteration(do not need to meet requirements) <br /> B.PROJECT SCOPE Requirements <br /> Table Instructions:include any process systems listed below within the scope of the permit application that are demonstrating compliance with mandatory requirements in Replacement Air to Hood Compliance Method§140.9(b)lA 5757 Pacific Avenue <br /> p p q F.REFRIGERATED WAREHOUSEISPACES Suite 226 <br /> 120.6je resns is requirements in 140.9. 02 Providing replacement air directly to the hood(s)that does not exceed 10%of the hood(s)exhaust rate. <br /> My project consists of(check all that apply: This Section Does Not Apply <br /> Stockton, CA 95207 <br /> 01 02 G.COMMERCIAL REFRIGERATION Mechanically cooled or heated makeup air delivered to any space with a kitchen hood is designed per 140.9(b)2A to not exceed the greater of: <br /> Refrigerated Spaces<3,000 ft'Total(no Title 24,Pt 6 requirements) Elevator Lighting&Ventilation Controls(mandatory 120.6f) 03 The hood exhaust flow minus the available transfer air from adjacent spaces. <br /> This Section Does Not Apply <br /> Refrigerated Spaces ftZ Total(mandatory 120.6 a ) � Escalator&Moving Walkway Speed Controls(mandatory 120.6 2000 L Street <br /> Food Stores>8,000 ft'cfa(mandatory 120.6 b) E] Computer Rooms>20W/ft'Power Density(prescriptive 140.9 a)' C 04 Location that is supplying transfer air: Serving/Prep Area&Expanded Kitchen Suite 125 <br /> H.ENCLOSED PARKING GARAGE EXHAUST <br /> Enclosed Parking Garage Exhaust>--10,000 cfm(mandatory J12Q.6 c) Q Commercial Kitchen Ventilation/Exhaust(prescriptive 140.9b)' This Section Does Not Apply Sacramento, CA 95811 <br /> Newly Installed Process Boilers(mandatory 120.6 d ) Laboratory Exhaust/Factory Exhaust&Fume Hood(prescriptive140.9 c )' 05 The kitchen/dining facility has a total Type I and Type II kitchen hood exhaust airflow rate>5000 cfm and is dign to have one of the following per 140.9(b)2B: <br /> ❑Compressed Air Systems Combined HP>25(mandatory 120.6 e) 1I.PROCESS BOILER Demand ventilation system(s)on at least 75%of the exhaust air per 140.9(b)2Bii <br /> 'FOOTNOTES:These building features can comply using the performance method. if using the performance method for these features,compliance should be demonstrated on This Section Does Not Apply T 209.944.91 10 <br /> the NRCC-PRF-E compliance document. Table Continued <br /> F 209.944.5711 <br /> C.COMPLIANCE RESULTS - J.COMPRESSED AIR SYSTEMS www.wmbarchitects.com <br /> This Section Does Not Apply <br /> Table Instructions:If any cell on this table says"DOES NOT COMPLY"or"COMPLIES with Exceptional Conditions"refer to Table D.for guidance. <br /> 01 02 03 04 05 06 07 08 09 10 11 K.ELEVATOR LIGHTING AND VENTILATION 0 <br /> Refrigerated Parking Escalators& <br /> Commercial Process Compressed Computer Commercial Laboratory IThis Section Does Not Apply <br /> Warehouse/ Garage Elevators Moving <br /> Refrigeration Boilers Air Systems Rooms Kitchens Exhaust <br /> Space 120.6 b Exhaust 120.6 d 120.6 e §120.6(f) Walkways 140.9 a 140.9 b 140.9 c Compliance Results <br /> 120.6 a 120.6 c 120.6 L.ESCALATORS AND MOVING WALKWAYS SPEED CONTROLS <br /> (See Table F) (See Table G) (See Table H) (See Table 1) (See Table J) (See Table K) (See Table L) (See Table M)(See Table N) (See Table 0) This Section Does Not Apply <br /> Yes COMPLIES <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http:Uwww.energy.ca.gov/title24/2019standards January 2021CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.eneray.ca.gov/title24/2014standards January 202 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http:/lwww.energy.ca.govltitle24/2019standards January 202 <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Process Systems Process Systems Process Systems <br /> NRCC-PRC-E(Created 01/21) CALIFORNIA ENERGY COMMISSION NRCC-PRC-E(Created 01/21) CALIFORNIA ENERGY COMMISSION NRCC-PRC-E(Created 01/21) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-PRC-E CERTIFICATE OF COMPLIANCE NRCC-PRC-E CERTIFICATE OF COMPLIANCE NRCC-PRC-E Gospel Center Rescue <br /> Table Instructions:Include any process systems that are within the sco e of the permit aPPlication and are demonstrating compliance with mandatory requirements in 120. or Table Instructions:Include any process systems that are within the scope of the permit application and are demonstrating compliance with mandatory requirements in 120. or Table Instructions:Include any process systems that are within the scope of the permit application and are demonstrating compliance with mandatory requirements in 120. or prescriptive requirements in 140.9.This compliance document is used for newly constructed,addition and alteration projects. prescriptive requirements in 140.9.This compliance document is used for newly constructed,addition and alteration projects. prescriptive requirements in 140.9.This compliance document is used for newly constructed,addition and alteration projects. Mission Kitchen <br /> Project Name: Gospel Center Rescue Mission Kitchen Remodel IReport Page: Page 4 of 6 Project Name: Gospel Center Rescue Mission Kitchen Remodel lReport Page: Page 5 of 6 Project Name: Gospel Center Rescue Mission Kitchen Remodel IReport Page: Page 6 of 6 Remodel <br /> Project Address: 445 S San Joaquin St.Stockton CA 95203 jDate Prepared: 2021-03-05 Project Address: 445 S San Joaquin St.Stockton CA 95203 JDate Prepared: 2021-03-05 Project Address: 445 S San Joaquin St.Stockton CA 95203 IDate Prepared: 2021-03-05 <br /> Field Inspector 445 S San Joaquin St. <br /> Kitchen Exhaust:Airflow Rate 4140.9(b)2 YES NO Form/Title Pass Fail DOCUMENTATION AUTHOR'S DECLARATION STATEMENT Li <br /> Stockton, CA 95203 <br /> 01 Kitchen Name or Tag Expanded Kitchen 112 Compliance Method Type I hood design exhaust rates do not exceed the maximum (" G N RCA-PRC-01-F Compressed Air Systems ❑ ❑ 1.1 certify that this Certificate of Compliance documentation is accurate and complete. <br /> per§140.9(b)1B allowed per§140.9(b)1 as documented below. <br /> (� ( NRCA-PRC-02-F Kitchen Exhaust ❑ ❑ Documentation Author Name:Jason Van Alst Documentation Author Signature: ji..�Curk <br /> 02 03 04 05 06 07 08 <br /> (` (� NRCA-PRC-03-F Garage Exhaust ❑ ❑Max Hood <br /> Desi Company: Alexander Scheflo & ASSOC. , Inc. Signature Date:03-18-21 <br /> Name or n Hood <br /> Design NRCA-PRC-04-F Refrigerated Warehouses-Evaporator Fan Motor Controls ❑ 1:1ENERGY <br /> , Hood Length Exhaust Rate Address: 2926 Pacific Avenue CEA/HERS Certification Identification(if applicable): <br /> Hood Type Hood Style Equipment Duty Exhaust Rate <br /> Item Tag (ft) Allowed (� (� NRCA-PRC-05-F Refrigerated Warehouses-Evaporative Condenser Controls ❑ ❑ COMPLIANCE <br /> (CFM) (CFM) City/State/Zip: Stockton, CA 95204 Phone: 209-948-9761 <br /> (� (� NRCA-PRC-06-Refrigerated Warehouses-Air Cooled Condenser Controls ❑ ❑ <br /> RESPONSIBLE PERSON'S DECLARATION STATEMENT <br /> KHD-1 Type I Wall-mounted Canopy 11.25 Heavy Duty 2,580 3,150 (` (� NRCA-PRC-16-Refrigerated Warehouses-Adiabatic Condenser Controls ❑ ❑ I certify the following under penalty of perjury,underthe laws of the State of California: <br /> (' (OR NRCA-PRC-07 Refrigerated Warehouses-Variable Speed Compressor ❑ ❑ 1.The information provided on this Certificate of Compliance is true and correct. <br /> KHD-2 Type Wall-mounted Canopy 9 Heavy Duty 1,920 2,520 g g Y ❑ ❑ g. P responsibility g g Y g <br /> (� (� NRCA-PRC-08-F Refrigerated Warehouses-Electric Resistance Underslab Heating System 2. I am eligible under Division 3 of the Business and Professions Code to accept res onsibilit for the building design or system design identified on this Certificate of <br /> (� (� NRCA-PRC-12-F Elevator Lighting&Ventilation Controls ❑ ❑ Compliance(responsible designer) <br /> 3.The energy features and performance specifications,materials,components,and manufactured devices for the building design or system design identified on this <br /> (' (� N RCA-PRC-13-F Escalators&Moving Walkways Speed Controls E] ElCertificateof Compliance conform to the requirements of Title 24,Part 1 and Part 6 of the California Code of Regulations. <br /> FOOTNOTE:Type 11 hoods do not hove a max hood exhaust air rate per Part 6 4140.9(b118. r N RCA-PRC-14-F Lab Exhaust Ventilation Systems Y ❑ ❑ 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable <br /> (� (i N RCA-PRC-15-F Fume Hood Automatic Sash Closure Systems El El compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with this building permit application. <br /> O.LABORATORY AND FACTORY EXHAUST AND FUME HOODS U 5.1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the building,and made available <br /> This Section Does Not Apply to the enforcement agency for all applicable inspections.I understand that a completed signed copy of this Certificate of Compliance is required to be included with the <br /> documentation the builder provides to the building owner at occupancy. <br /> P.DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION U Responsible Designer Name:Mitch Scheflo Responsible Designer Signature: pd_�4_0 <br /> Table Instructions: Selections have been made based on information provided in previous tables of this document. If any selection needs to be changed,please explain why in Company:Alexander Scheflo & Assoc. , Inc. Date Signed:03-18-21 <br /> Table E.Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at httos://ww2.eneray.ca.aov/ <br /> title24 2019standords 2019 com liance documents Nonresidential Documents NRCA . Address: 2826 Pacific Avenue License:M025588 <br /> YES NO Form/Title Field Inspector City/State/Zip:Stockton, CA 95204 Phone:209-948-9761 <br /> Pass Fail Add Responsible Person <br /> (� (� NRCI-PRC-01-E Covered Process ❑ ❑ <br /> Q.DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE ( ) <br /> Table Instructions: Selections have been made based on information provided in previous tables of this document. If any selection needs to be changed,please explain whyin <br /> Table E.Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at https://ww2.energy.ca.goy/ <br /> title24 2019standords 2019 compliance documents Nonresidential DocumentsINR . <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http:/Iwww.energy.ca.gov/title24/2019standards January 2021 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http:/Iwww.energy.ca.gov/title24/2019standards January 2021 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards January 2021 <br /> C <br /> PUBLISH HISTORY: <br /> No. DATE PURPOSE <br /> F_ <br /> 12.17.20 PERMIT SUBMITTAL <br /> A03.12.21 PLAN CHECK#1 <br /> N <br /> I <br /> N <br /> O <br /> N <br /> L <br /> a <br /> a <br /> 0 <br /> N <br /> O <br /> O <br /> LO <br /> n <br /> i WMB PROJECT: <br /> Q <br /> 20-042 <br /> / <br /> U <br /> O <br /> J <br /> ALEXANDER SCHEFLO <br /> eR� A S and ASSOCIATES, Inc. T24 . 1 <br /> / Mechanical Engineers (209) 948-9761 <br /> L <br /> 025 8 2926 Pacific Ave. Stockton, Ca. 95204 <br /> * Exp. 09-30-22 ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN <br /> CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE <br /> F CHAI4 Fpm ENGINEER AND THE SAME MAY NOT BE USED, DUPLICATED, OR <br /> OF' CA�-� DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE ENGINEER. <br /> © Alexander Scheflo & Assoc., Inc <br /> 6i Copyright WI <br /> _J <br /> L� <br />
The URL can be used to link to this page
Your browser does not support the video tag.