My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0040203
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUIS PARK
>
0
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0040203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 9:38:13 AM
Creation date
12/13/2021 9:10:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0040203
PE
4372
STREET_NUMBER
0
STREET_NAME
LOUIS PARK
City
STOCKTON
Zip
95203-
APN
13306001
ENTERED_DATE
10/23/2019 12:00:00 AM
SITE_LOCATION
0 LOUIS PARK
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
CYEAR
2019
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notification #1600-2018-0342-R3 <br />Streambed Alteration Agreement <br />October 28, 2019 <br />Page 20 of 24 <br />completion. The report shall include species encountered, capture methods; <br />methods used for handling, stress minimization, equipment cleaning and <br />disinfection; sizes of holding facilities; descriptions of relocation sites; and all <br />instances of mortality and injury. <br />4.2 Monthly Monitoring and Compliance Reports. The Qualified Biologist shall submit a <br />monthly report electronically to CDFW that includes the following items: <br />• Notification number, <br />• Begin and end times of daily worksite monitoring, <br />• Begin and end times of all activities associated with the project, <br />• Survey results, <br />• A summarized description of whether compliance for all avoidance and <br />minimization measures has been met, <br />• Recommendations to achieve compliance of any avoidance and minimization <br />measures that have not been met, <br />• Fish and wildlife species (and their sign) observed during monitoring, <br />• Any instances of capture and relocation of fish and wildlife, <br />• Any avoidance behaviors of fish and wildlife, <br />• Photo documentation of site conditions. <br />4.3 Final Construction Report. A final construction report shall be submitted to CDFW <br />within 30 calendar days of the date of completion of all construction activity. This <br />report shall detail dates construction occurred, pertinent information concerning the <br />success of the project in meeting avoidance and minimization measures, mitigation <br />measures, conservation measures, detailed summaries of any deceased wildlife <br />discovered at the site, and/or any detailed summaries required in the measures of <br />this Agreement. An explanation of failure to meet such measures as specified in <br />this Agreement shall also be included, if applicable. <br />4.4 Annual Riparian/Tidal Wetland Remediation Monitoring Report. An annual <br />monitoring report shall be submitted to CDFW by December 31 of each monitoring <br />year. The report shall include an assessment of the remediation monitoring, <br />overall vegetation cover, , invasive species establishment (if any), invasive species <br />cover by percent, establishment of riparian vegetation and tidal wetland vegetation, <br />and photo documentation. <br />4.5 Notification to the California Natural Diversity Database (CNDDB). If any listed, <br />rare, or special status species are detected during project surveys or on or around <br />the project site during project activities, Permittee shall submit CNDDB Field <br />Survey Forms to CDFW in the manner described at the CNDDB website <br />(http://www.dfg.ca.gov/biogeodata/cnddbn within 30 days of the sightings. Copies <br />of such submittals shall also be submitted to the CDFW regional office as specified <br />below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.