Laserfiche WebLink
5-5 <br />• Decontamination shower located in the maintenance area with a 250-gallon <br />capacity; aM <br />• Backup generators; <br />• ~Seven Honda water pumps-;-; and <br />• Strobe lights are utilized during any operation period in the dark. <br />Depending on their job function, personne l at the RRF/Compost Facility are required to Ylear <br />stee l toed and soled sa f ety boots, glol;,es, safety vests, hard hats, hearing pro t ection, and <br />sa f ety glasses. <br />5.8 Power Failure <br />lnc/we provisions for AandJingpower la/lures. <br />All of the Compost Facility's processing equipment will be diesel powered, and thus not <br />subject to power failure. Backup generators will be maintained on-site to provide power to <br />the RRFjCompost Facility office trailer and the landfill's administration office during power <br />outages. <br />Forward Composting Facility SWT Engineering <br />Report of Composting Site Information -May 2014 <br />z:\projects\allied waste \forward\resource recovery facil ity \5 yr perm it rvw 2013-14\rcsi 2014\text\sec 5 -revtr.doc