Laserfiche WebLink
6-1 <br />6.0 POST-OPERATIONAL USE <br />If known, describe the uses of the site after termination o.l the composting opOFation, <br />incliJdiRg the time #ame for implementation olsuch use. <br />The Compost Facility is designed to operate indefinitely as a regional composting facility. <br />However, the site is permitted for future WMUswaste management units (WMUs). Compost <br />operations will be discontinued when Forward ~ begins development of this area for <br />refuse disposal or moved to another area of the property. Any change of location will require <br />the RCSI to be amended and submitted to the LEA for review and approval of the document <br />and SWFP. as necessary . <br />Forward Compostlng Facility SWT Engineering <br />Report of Compostlng Site Information -May 2014 <br />z:\projects \allied waste \forward\resource recovery facility \5 yr perm it rvw 2013-14\rcsi 2014\text\se c 6 -revtr .doc