My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_[REV] MAY & JULY 2014 RCSI
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieve Reports
>
ARCHIVED REPORTS_[REV] MAY & JULY 2014 RCSI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:54:23 PM
Creation date
12/16/2021 11:31:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
[REV] MAY & JULY 2014 RCSI
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
materia ls . The Gourse is repeated annually. All ne' .... employees a re enrolled i n the <br />co urse at the earliest available c lass afte r t he ir hire. <br />Spec if ic eme rgency response and evacuation procedures fo r all Forvt'ard emp loyees <br />and members of the emergency response team are covered in t he t rain ing sessions <br />Gonducte d at t he site throughout the year. <br />It should be noted that the Compost Facility will be supervised by a director of <br />operations, who will be on-site 40 hours per week during regular business hours. <br />5.0 PLAN REVISION <br />A copy of the LEA-approved OIMP will be kept at the designated Compost Facility <br />Office. The OIMP will be reviewed at a minimum of once yearly on the anniversary of <br />its approval and any necessary changes and updates will be made . A copy of an <br />amended OIMP will be submitted to the LEA in accordance with 14 CCR, Section <br />17863.4. <br />Forward Compost Fac i lity -OIMP 13 SWT Engineering <br />z:\projects\aliied waste \forward\resource recovery facility\5 yr perm it rvw 2013-14\rcsi 2014\appendices\app e·oimp\oimp <br />text. doc; 5/16/2014
The URL can be used to link to this page
Your browser does not support the video tag.