My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_JULY 2014 FINAL TPR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_JULY 2014 FINAL TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:26:22 AM
Creation date
12/16/2021 12:35:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
JULY 2014 FINAL TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
".' <br />Mitigation Monitoring Program (MITIGATION MONITORING AND REPORTING PROGRAM: <br />CONSOLIDATED FORWARD LANDFILL PROJECT). The applicant and the Community <br />Development Department shall annually review the program. Not less than 30 days nor more <br />than 60 days prior to the first anniversary date of this approval, and each anniversary date <br />thereafter, the applicant shall submit to the Community Development Depariment a letter setting <br />forth the applicant's good faith compliance with the teons and condHions of the program. <br />Community Development Department staff will visit the sHe semi-annually. All costs incurred by <br />the Community Development Department forthe semi-annual monitOring and the annual review <br />shall be bome by the applicant. The costs may include costs of Community Development <br />Department staff and administrative time and direct out~of-pocket costs and expenses, including <br />costs of consultants and non-department personnel. Community Development Department staff <br />time may include overhead costs and will be consistent with Department policy. <br />g. MITIGATION MEASURES: The following mitigation measures identified In the Final <br />Environmental Impact Report: Consolidated Forward Landfill Project (SCH # 2001052081), <br />November 2002 are adopted as conditions of approval: <br />(NOISE) <br />(1) 6 (C.3) <br />Identified in EIR: <br />(a) Heavy equipment operations shall not be conducted within 1500 feet of any occupied <br />residence after 10 p.m. and before 6 a.m.; or <br />(b) Equipment operations within 1500 feet of any residence after 10 p.m. or before 6 a.m. <br />shall be fully shielded from the direct fine of sight to the residence by an earthen beon whose <br />crown elevalion exceeds the elevation of the top of the exhaust stack. .. <br />(2) 7 Forward 1993 (E3) . <br />The landowner and tenant at R1 (residence at 9690 AustinRoad) shall be provided with the <br />option of requesting a sound wall to reduce noise exposure both in the front yard and within <br />the home. Table III.E.B in the Draft ElR shows the noise reduction provided by a variety of <br />different sound wall desIgns. The footnotes to Table III.E.B describes the alternative designs <br />in detail). Note that any of these designs will be more than sufficient to reduce project noise <br />impacts below a level of significance_ <br />(3) 8 Forward 1993 (E1) <br />The contractor shall be required to employ the qUietest among alternative equipment or to <br />muffle/control noise from available equipment. , <br />(4) 9 Forward 1993 (E2) <br />Muffling of equipment used on site sha6 be maintained to factory specifications. <br />(5) 10 Austin 1994 (H1.a) (similar), Austin 2000 (H1.a) <br />The proposed project must conform to the San Joaquin County Noise Standards contained in <br />. the County's General Plan. The project sponsor shall be required to demonstrate compfiance <br />with this performance standard. WOfk areas could be limited, work times close to the <br />residence could be rescheduled, noise barriers such as earth berms could be designed, and <br />noise monitoring shall be undertaken to demonstrate compliance in the event noise <br />complaints are received. <br />(6) 11 Austin 1994 (H1.b), Austin 2000 (H1.b) <br />If project-related noise levels measured at the property line of any reSidential use would <br />San Joaquin County <br />Community Development <br />UP-QO-7, ER-QO-2\Forward, Inc. <br />Page 2
The URL can be used to link to this page
Your browser does not support the video tag.