My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_JULY 2014 FINAL TPR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_JULY 2014 FINAL TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:26:22 AM
Creation date
12/16/2021 12:35:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
JULY 2014 FINAL TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ocours. The conditions of the active fades of a landfill, as well as the leachate generated, <br />must be monitored and professional judgment utilized at all times to keep these two factors in <br />balance. <br />g. 18 Forward 1993 (D2) <br />Portions of the site that either have been filled to the extent allowed or are not expected to be <br />worked for extended periods (six months or longer) shall be sown with fast-germinating <br />drought-tolerant grass seed and watered until a cover of vegetation is established. <br />h. 19 Austin 1994 (G1.b), Austin 2000 (G1.b) (similar) <br />The project sponsor shall seek to minimize the extent of area exposed to wind erosion. <br />Exposed surfaces, including stockpiles, shall be vegetated to the extent possible. <br />i. 20 Austin 1994 (G1.c), Austin 2000 (G1.c) <br />Plan and phase construction and closure operations such that they do not take place <br />simultaneously on dry windy days. Schedule particularly dusty awAties on separate days. <br />j. 21 Austin 1994 (G1.d), Austin 2000 (G1.d) <br />Design the site filling plan to facilitate screening of the active face from the prevailing winds, <br />whenever possible, to minimize the amount of windblown dust released from the working <br />face. <br />k. 22 Austin 1994 (G1.e), Austin 2000 (G1.e) <br />Haul trucks carrying easily airborne material shall be covered during transport and sprayed <br />with water prior to dumping if it Is shown that this would reduce dust emissions during off- <br />loading activities within the landfill. <br />I. 23 Austin 1994 (G1.f), Austin 2000 (G1.f) <br />The landfill operator shall restrict truck and equipment fravfll over loose, uncompacted, <br />unpaved surfaces. <br />m. 24 Forward 1993 (D5) <br />A particulate/meteorological monitoring station should be installed tX1 the project site, <br />preferably near the site boundary with one of the closer residential receptors. This monitoring <br />station should be operalional for a minimum of six months during the dry season (April- <br />September) before landfill activity begins to intensify as a result of project implementalion. <br />Data should be collected daily during Ihis baseline period, during the landfill's transition to <br />higher project-related activity levels, and during the landfill's peak operational phases <br />Ihereafter. If Ihe more inlensive landfill operations are found to increment the 24-hour <br />average oflhe annual average PM10 levels by more than 5 ug1m3 over baseline, <br />respectively, even with Ihe implemenlalion of all the above-mentiolled dusl controls, further <br />dust control measure andlor limits on the amount of wasle received at the Site may be <br />necessary to control PM10 impacts. <br />n. 25 Forward 1993 (D6) " <br />Forward, Inc. shall schedule regular deliveries of waste at the landffll to minimize queuing and <br />idling. <br />o. 26 Austin 1994 (G2.b), Austin 2000 (G2.b) <br />The idling of all internal combustion equipment shall be limited to ten minutes at any given <br />time. <br />San Joaquin County <br />Community Development <br />UP-00-7, ER-00-21F0IWard, Inc. <br />Page 20
The URL can be used to link to this page
Your browser does not support the video tag.