My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_JULY 2014 FINAL TPR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_JULY 2014 FINAL TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 11:26:22 AM
Creation date
12/16/2021 12:35:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
JULY 2014 FINAL TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p. 27 Austin 1994 (G2.a), Austin 2000 (G2.a) <br />All internal combustion engine driven equipment should be properly maintained and tuned <br />according to manufacturers specifications. <br />q. 28 Forward 1993 (08) <br />All VaG-contaminated soil which is not being treated shall be covered with six-mil non-porous <br />plastic. . <br />r. 29 Forward 1993 (09) <br />If VaG emissions exceed APGD limits for open aeration, a VaG collection and removal <br />system shall be installed to minimize VaG emissions. <br />S. 30 Forward 1993 (010) <br />Any net increase in VaG emissions which remain after the installation of a collection/removal <br />system shall be offset to the degree required by SJVUAPGD Rule 220.1 <br />t. 31 (E.1) <br />Proposed as Part of the Project: <br />Use a total of 17 pieces of equipment (at any given time) over the life of the project to <br />minimize particulate discharge. As shown in Table IV.E-1 (of the EIR) the risk from <br />particulate-and specifically diesel fumes-was lessened for the project versus the baseline <br />conditions is the existing 28 pieces of diesel powered landfill operating equipment to be <br />changed out every 5 years at Forward and every 10 years at Austin would be changed to <br />using a total of 17 pieces of equipment over 15-year or less replacement scenarios. <br />u. 35 (E.4) <br />Proposed as Part of the Project: <br />Where ·required by State and Federal regulations, the landfill gas monitoring, gas control and <br />collection system will be installed, extending to the new areas of the expanding landfill and <br />operating in conformance with applicable regulations. <br />The existing gas extraction system, or an equivalent system, will continue to operate. <br />Regular gas monftoring will be conducted to prevent explosive or toxic gas accumulation in <br />onsite buildings or beneath temporary buildings. The landfill operator will install an automatic <br />combustible gas detection and alarm system for structures at the site. <br />v. 39 (E.S) <br />Identified in EIR: <br />Forward Landfill shall continue to test all known water supply wells within the area of the <br />mapped and prOjected groundwater plume. Groundwater monitoring test shall be performed <br />quarterly at all dowligradient private wells at risk. Where detectable vacs have historically <br />been reported, bottled water shall continue to be supplied by the applicant (as is currenUy <br />being done for two affected households) until the well sample analytical results show no <br />detectable VOCs for four consecutive quarterly sampling events. other offsite private wells <br />such as the CYA wells that have not been adversely affected by the plume shall continue to <br />be monitored and if VOG-contamination is reported then replacement water shall be provided <br />by the applicant, if requested. For wells within the footprint of the plume, institutional controls <br />such as notification to current and future landowners regarding risks of installing production <br />wells shall be implemented as part of the local well permitting process. <br />San Joaquin County <br />Community Development <br />UP-DD-7, ER-DD-2'Forward, Inc. <br />Page 21
The URL can be used to link to this page
Your browser does not support the video tag.