Laserfiche WebLink
Consolidated Forward. ~. Landfill Page 6 <br />grinder/screener have a sufficient moisture content to prevent generation of visible dust <br />or particulate matter. ( <br />14 (D.S) <br />Proposed as Part of the Project: <br />~leasures that reduce landfill traffic and operations impacts through the use of Best Available <br />Control Methods (BACMs) as defined by the San Joaquin Valley Vnified Air Pollution <br />Control District (SNUAPCD) shall be required to reduce this cumuIative impact. <br />15 Austin 199-1 (GS.b), Austin 2000 (GS.b) <br />Ercessively odorous wastes shall be mixed immediately with other landfill wastes, depending <br />on their nature and source. If diluting the intensity of odor is not sufficient, then the operator <br />shall immediately cover offensive materials as soon as they arrive aI the landfill. <br />16 Austin 199-1 (GS,c), Austin 2000 (GS.c) <br />n,e operator shall ellSure that loading, unloading, and material har.tiling activities are <br />carried out efficiently and »ithout delays to avoid excessive odors. <br />17 Forward 1993 (D1) <br />L5e water trucks and/or sprinkler systems to apply water a minimum of twice daily to <br />roadways and activefaces of asbestos disposal areas to minimize airborne dust leaving the <br />site. It is recognized that a balance must be struck between maintaining sufficient moisture <br />for dust cOlllrol and applying toO much moisture such that the generaIion of excess leachate <br />occurs. The conditions of the active faces of a landfill, as well as the leachate generated, <br />must be monitored and professional judgment utilized at all times to keep these two factors in <br />balance. <br />18 Forward 1993 (D2) <br />PornollS of the site that either have been filled to the extent allowed or are not expected to be <br />worked for extended periods (six months or longer) shall be so»n .... i:th fast-germinating <br />drought-tolerant grass seed and watered until a cover of vegetation is established. <br />19 Austin 199-1 (G1.b), Austin 2000 (Glob) (similar) <br />The project sponsor shall seelc to minimize the extent of area exposed to wind erosion. <br />Exposed suifaces. including stockpiles. shall be vegetated to the eXtent possible. <br />'. 20 Austin 1994 (G1.c), Austin 2000 (GI.c) <br />Plan and phase cOIIStruction and closure operations such that they do not take place <br />simultaneously on dry windy days. Schedule particularly dusty acmmes on separate days. <br />21 Austin 199-1 (G1.d), Austin 2000 (G1.tI) <br />Design the site filling plan to facilitate screening of the active face from the prevailing winds, <br />whenever possible, to minimi=e the amount of windblown dust releasedfrom the working <br />face. <br />22 Austin 199-1 (G1.e), Austin 1000 (G1.e) <br />Haul trucks carrying easily airborne material shall be covered during trallSpon and sprayed <br />\ljth water prior to dumping if it is shown that this would reduce tr.1S1 emissiollS during off- <br />loading activities within the landfill. <br />23 Austin 199-1 (G1.j), Austin 2000 (G1.j) <br />( . <br />\.