Consolidated Forward _ .~. Landfill Page 16 <br />51 (F.9) (. <br />Identified in This Em: ... <br />Replacement well& (as well as additional wells north of the Austin Road Landfill to better <br />defme the leading edge of the plume) shall be installed to mitigate against the loss of old <br />wells as presented in the JTD currently under review by the RWQCB. The RWQCB must <br />approve the JTD's plans for the number and location of the new wells as part of their: <br />approval process, which is separate from the EIR approval process. <br />52 Austin 1994 (K3.c), Austin 2000 (K3.c) <br />The timing of the pumped discharge from the detention pond must not occur wilh the peak <br />flow rate of Little John 's Creek as this would impact downstream locations by increasing the <br />flood hazard. Telemetry. which mOllitors the flolV ill the creek to determine the peak. should <br />be provided. This infonnalion should then be used to coordinate the start up of the pumps. <br />53 Austin 1994 (K5.e), Austin 2000 (K5.e) <br />The landfill operator would include praclices alld procedures in the SWFP to comply with AB <br />1760. The procedures lVould describe how the expanded lalldflll would salvage all <br />economically feasible metallic discards. <br />54 Forward 1993 (e3) <br />Diesel fuel should be stored ill a manner which provides for secondary containmelll. <br />G. SOILS AND GEOLOGY <br />55 (G.2) <br />Proposed as Part of the Project: <br />56 (G.3) <br />Should additional cover material be needed, alternative daily covers, approved by the <br />CIWMB, will be examined and used. <br />Proposed as Part ofthe Project: <br />57 (G.4) <br />The project sponsor has prepared a seismicity study for the site. If the potential maximum <br />peak ground acceleration in the seismicity study is greater than that assumed in the <br />preliminary design, the final project design analysis will make modifications needed to meet <br />the factor of safety (determinations may be subject to the approval of the CIWMB and/Or <br />RWQCB). Impacts to the new liner and drainage system installed over the Austin Road <br />Landfill will be monitored as appropriate based on any stipulations of the CIWMB and/or <br />RWQCB. <br />Proposed as Part of the Project: <br />58 (G.5) <br />Overall reduction-{)r, in some cases, elimination or improvement-{)f slope instability at the <br />project site can be achieved through the implementation of the seismic design measures <br />designed to meet CCR Title 27. <br />Proposed as Part of the Project: <br />The applicant's Joint Technical Document references an erosion management plan that <br />delineates various actions to minimize erosion and sedimentation, including appropriate <br />construction, landscaping. and maintenance of graded slopes and subsurface drainage <br />( <br />( <br />,I