Laserfiche WebLink
Consolidated Fon-'ard Inc. Landfill Pagel7 <br />systems. As part of that plan, grading operations will be scheduled ·to avoid the rainy season <br />and be implemented by interim engineering control measures. Before grading is stopped, <br />slope"s \\ili be directed to carry runoff to areas where erosion and sedimentation can be <br />controlled. Truck beds will be hosed down to reduce soil spillage on paved roads and wind- <br />blo\\l1 dust. Relocation of Littlejohns Creek could lessen the sedimentation potential to the <br />creek. <br />Completed cells wi1l be stabilized by the planting and maintenance of drought-resistant <br />grasses. This will inhibit wind and water erosion and ma-ti:mize the fertility of the soil in <br />order to facilitate"tevegetation. <br />Temporary plantings, geofabric drapes, and erosion-preventing diversions of surface water <br />" \\ill be constructed as appropriate on temporary slopes. <br />Regular operational and post-closure monitoring of erosion control structures and plantings <br />\\ill be done for a minimum of five years. <br />59 Fonvard 1993 (B.S) <br />Assessment of grollndwater levels in monitoring wells shall be initiated within 24 hours <br />jol/olling an earthquake event haVing a Modified Afercalli intensity ofVor greater at the <br />/aml,fil/. This will allow the water level database to be adjusted or seismic variations. In the <br />evel/t that anomalous water level changes are noted. a series of water quality sampling and <br />testing events shall be initiated by the applicant in coordination with the RWQCB to detect an <br />changes in water qllality that may signify subsuiface adjustments in landfill cells. <br />60 Fonvard 1993 (B.6) <br />Benchmarks shall be established (these could utilize monitoring well top of casing <br />elevations). which will allow for determinations of settlement! consolidation of fill materials <br />in closed sections of the landfill on an annual basis andfollowing significant seismic events <br />(Modified Mercalli Scale of V or above). In the event that changes are noted, the cause <br />should be determilled as should the effect on leachate collection and recovery systems. <br />Repair liners and LCRS as necessary. In addition. remedial grading should be accomplished <br />to restore the original cap's junction to repel water and direct suiface TIInoff. <br />H, BIOLOGICAL RESOURCES <br />61 (B.2) <br />Identified in This EIR: <br />62 (B.3) <br />Night lighting with sodium lamps with sharp cutoff angles shall be used to focus light in <br />acti\"e landfill areas (target areas) and to avoid nighttime lighting of adjacent open, areas and <br />trees. <br />Proposed as Part of the Project: <br />As a participant in the SJCMSCP, Forward will incorporate SJCMSCP guidelines developed <br />to minimize effects of rodenticides to the garter snake, the brush rabbit and the Swainson's <br />Hawk (Appendix A of the SJCMSCP). " <br />Identified in This EIR: