Laserfiche WebLink
XIV. ENGINEERING CERTIFICATION OF REVIEW <br /> December 1, 1988 <br /> I have reviewed the site design and operation plan. Based on the <br /> information I have reviewed, I have determined that the Foothill <br /> Sanitary Landfill operation, if carried out as stated in such <br /> documents and according to the groundwater monitoring <br /> recommendations stated in this review, will meet current <br /> California Health, Safety and Environmental Standards. Further, <br /> I estimate the remaining site life to be 86 years based on the <br /> current design plan and the assumptions stated in Section I.H. of <br /> this Engineering Review. <br /> .a (J. U <br /> g4ulfiarf <br /> UR CC t - <br /> 1 d <br /> e4s R. .E. 4 4119 <br /> 1,10. C 0 19 <br /> Exp. <br /> CIV%\- <br /> LIFOR <br /> 50 <br />