Laserfiche WebLink
F <br /> 0 <br /> 'O PQUIN .CD - <br /> COUNTY F SAN JOAQUIN THOMAS R.FLINN <br /> N' .< DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> R O.BOX 1810-1810 E.HAZELTON AVENUE <br /> tiFOR�' STOCKTON,CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> March 15, 2001 <br /> Wendy Arano - <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road <br /> Sacramento, California 95827 <br /> SUBJECT: PROPOSED EVALUATION MONITORING PLAN AMENDMENT <br /> Dear Ms. Arano: <br /> This is an amendment to the proposed evaluation monitoring plan for the Foothill Sanitary Landfill, dated <br /> November 24, 2000. Regional Board staff reviewed the proposed plan and determined that an evaluation <br /> of the delineation of release was still necessary. The County is proposing the installation of two new <br /> groundwater wells. They will be placed along the perimeter of the property to better define groundwater <br /> conditions beneath the site, and detect any release exiting the property. Please see the attached map for <br /> general locations of these new wells. <br /> Additionally,Regional Board staff stated that the Joint Technical Document Indices also needed to be <br /> submitted. The indices are also included as attachments to this document. <br /> If you have any questions,please contact me at(209)468-3066. <br /> Sincerely, <br /> W/"Y - <br /> MICHAEL KALISH <br /> Associate Engineer <br /> MK:cg <br /> N.-\MichaeNFMeval_delin.wpd <br /> Attachments <br /> c: Robert McClellon,Lead Senior R.E.H.S.,Environmental Health Division,Public Health Services <br /> LA 64201 <br />