Laserfiche WebLink
Item No. 2 <br /> PC: 7-2-87 <br /> SU-87-12 <br /> Page 6 <br /> The Lathrop County Water District is in the process of <br /> constructing sanitary sewage facilities that will connect to <br /> the City of Manteca Wastewater Treatment Facility. <br /> Construction is expected to be completed by July 1987 . This <br /> subdivision will be served by this system. <br /> Preliminary information from the Lathrop County Water District <br /> indicates that the sewer allotment for this project is 35 <br /> hookups (at approximately 4.5 hookups per gross acre) . An <br /> additional six hookups will be required to serve the sub- <br /> division. The District has indicated that it is prepared to <br /> serve the project with sewer service upon the lifting of the <br /> current building moratorium. <br /> The Planning Title requires public sewer for the proposed sub- <br /> division. Specific conditions of approval have been developed <br /> to address sewage disposal . <br /> Drainage : <br /> The project site is in Zone C of County Service Area No. 4, <br /> which provides terminal drainage to the project area. A ter- <br /> minal drainage main is now being constructed and is nearly <br /> completed. The terminal drainage must be completed prior to <br /> additional development in this area. <br /> In order to insure adequate drainage for this and other adja- <br /> cent subdivisions, a preliminary master storm drainage study <br /> has been prepared by Thompson-Hysell Engineers. Final approval <br /> of the master plan by the Department of Public Works will be <br /> required prior to approval of the final map. As proposed, the <br /> Sunset Manor project will develop a storm drainage collection <br /> system which will tie into the master plan facilities. <br /> Specific conditions of approval relative to storm drainage have <br /> been developed. <br /> Fire Protection: <br /> Fire protection will be provided by the Manteca-Lathrop Fire <br /> District, whose main station is located approximately 1 ,500 <br /> feet from the subdivision. The District indicates that fire <br /> hydrants built to District specifications will be required. <br /> Schools: <br /> The project site is within the Manteca Unified School District, <br /> which is currently experiencing overcrowding at the Lathrop <br /> Elementary School . The project is subject to the payment of <br />