My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
845
>
2200 - Hazardous Waste Program
>
PR0513936
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 11:03:08 AM
Creation date
1/5/2022 10:32:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513936
PE
2228
FACILITY_ID
FA0003984
FACILITY_NAME
PEP BOYS #0710
STREET_NUMBER
845
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734514
CURRENT_STATUS
01
SITE_LOCATION
845 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pep Boys #710 <br />from the date the exemption was granted. The tank system owner or operator shall submit <br />documentation of local agency approval to the applicable CUPA for review and possible <br />acceptance in lieu of the assessment specified in subsection (k) of this section. If there is no <br />CUPA, or the CUPA requests that the Department make a determination, the documentation <br />shall be submitted to the Department. Not applicable ---an exemption has not been granted by <br />the CUPA. <br />0)(1) (1) tank system must have secondary containment capable of containing 100 percent of <br />the contents of the tank and ancillary piping volume; and — this requirement is satisfied because <br />all tanks are double walled. See tank specifications in Appendix B. <br />(j)(2) if the tank system is exposed to precipitation, the secondary containment system must <br />have sufficient capacity, in addition to that required in subsection 6)(1) of this section, to <br />contain run-on and infiltration from a 25 -year, 24-hour rainfall event, The tanks are located in a <br />building and are not exposed to precipitation, run-on or infiltration. <br />(j)(3) tank system secondary containment shall be provided with a leak detection system that is <br />designed and operated so that it will detect either the failure of the primary and secondary <br />containment structure or any release of hazardous waste or accumulated liquid in the secondary <br />containment system within 24 hours, or at the earliest practicable time if the existing detection <br />technology or site conditions will not allow detection of a release within 24 hours. The tanks are <br />inspected by Pep Boys employees daily and an inspection log is kept. <br />(k) The tank system assessment shall include all of the following information: <br />(k)(1) tank configuration (i.e., horizontal, vertical), material of construction, and gross capacity (in <br />gallons); See tank configurations, materials of construction and capacities in Table 1. <br />(k)(2) design standard(s), if available, according to which the tank and ancillary equipment were <br />or will be constructed and all of the following information. <br />(k)(2)(A) material of construction; All tanks are made of steel. See Table 1. <br />(k)(2)(B) material thickness and the method used to determine the thickness; thicknesses were <br />measured with an ultrasonic gauge, see Table 11 for measurements. <br />(k)(2)(C) description of tank system piping (material, diameter); this certification is for the tanks <br />only. <br />
The URL can be used to link to this page
Your browser does not support the video tag.