My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
845
>
2200 - Hazardous Waste Program
>
PR0513936
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 11:03:08 AM
Creation date
1/5/2022 10:32:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513936
PE
2228
FACILITY_ID
FA0003984
FACILITY_NAME
PEP BOYS #0710
STREET_NUMBER
845
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734514
CURRENT_STATUS
01
SITE_LOCATION
845 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTAINMENT <br />SOLUTIONS <br />SPECIFICATIONS <br />SAFEWASTETm HAZARDOUS LIQUID STORAGE SYSTEM <br />WITH ENVIRONMENTAL TANK ENCLOSURE <br />1.0 GENERAL TANK DESCRIPTION: <br />1.1 The SafeWaste Aboveground Used Oil Collection and Storage Systems are constructed <br />in accordance with National, State, and Locally recognized Aboveground Storage Tank <br />Standards, such as: Underwriters Laboratory Standard 142 for the primary tank, National <br />Fire Protection Association Sections 30 & 30A, and Uniform Fire Code. <br />1.2 The SafeWaste Systems provide a minimum of 110% secondary containment for the <br />primary tank, and 360° radius containment for the primary tank and control assemblies. <br />1.3 The control assemblies shall be new, and installed on top of the primary tank at the <br />factory. <br />1.4 The anchoring tie downs shall be an integral part of the exterior support feet and shall be <br />welded to the bottom of the Environmental Tank Enclosure. <br />1.5 The SafeWaste Systems must be off-loaded on site with a large forklift or crane. <br />1.6 All openings in the primary tank shall be from the top, with threaded NPT fittings. <br />1.7 The SafeWaste Systems shall include a one (1) year warranty for the tanks and <br />accessories. <br />1.8 The SafeWaste manufacturer shall provide proof of a minimum 10 years of <br />manufacturing SafeWaste Systems. <br />2.0 PRIMARY STORAGE TANK: <br />2.1 The primary storage tank shall be rectangular in design and constructed of UL specified <br />steel thickness, with continuous welds. <br />2.2 The primary storage tank shall be constructed and listed in accordance with UL 142 <br />standards. <br />2.3 The primary tank shall be fitted with a minimum of: a 3/4" product inlet, a 2" overfill <br />prevention valve, a 2" suction tube for product withdrawal, a 2" primary working vent, <br />either a 4" or 6" emergency vent, a 2" product level gauge, and a 1" sampling port. <br />2.4 The primary tank shall be pressure tested to UL 142 Standard (minimum 3 to maximum 5 <br />psi) at the factory. <br />E <br />March 2009 • ©Copyright 2009 • Containment Solutions, Inc. • All Rights Reserved • Pub_ No. SW5501B <br />
The URL can be used to link to this page
Your browser does not support the video tag.