4 During the September 4, 2012, UST inspection, the only employee on site, Ms.
<br />Amrit Gill, was not trained by the designated operator.
<br />4 During the September 28, 2012, UST inspection, the only employee on site, Mr.
<br />Harnek Singh, was not trained by the designated operator.
<br />T23, CCR 2715(f)(2) Designated operator employee training not current for at least
<br />one employee on site. By July 1, 2005, and every twelve months thereafter, the
<br />designated UST operator(s) shall train facility employees for which he or she is
<br />responsible in the proper operation and maintenance of the underground storage tank
<br />system. For facility employees hired on or after July 1, 2005, the initial training shall be
<br />conducted within 30 days of the date of hire.
<br />(2) At least one of the facility employees present during operating hours shall have
<br />current training in accordance with subdivision (f)(1). For facilities that are not
<br />routinely staffed, the designated UST operator shall implement a facility employee
<br />training program approved by the local agency.
<br />4 During the July 28, 2010, UST inspection, the only employee on site, Mr.
<br />Khajevandi, was not trained by the designated operator within the past 12 months.
<br />V. ATTACHMENTS
<br />Attachment 1 -
<br />July 23, 2008, routine UST inspection report
<br />Attachment 2 -
<br />July 23, 2008, routine hazardous waste inspection report
<br />Attachment 3 -
<br />Permit application SR0054934
<br />Attachment 4 -
<br />SR0054934 inspection report
<br />Attachment 5 -August
<br />1, 2008, work order for dispensers 5/6 and 9/10
<br />Attachment 6 -
<br />Manifest 001738275FLE
<br />Attachment 7 -
<br />July 23, 2008 monitoring system test report dated July 23, 2007
<br />Attachment 8 -
<br />Items submitted September 9, 2008, in response to July 23, 2008, UST
<br />inspection report
<br />Attachment 9 -
<br />October 9, 2008, follow up letter to July 23, 2008, hazardous waste
<br />inspection report
<br />Attachment 10
<br />- November 17, 2008, follow up and complaint hazardous waste
<br />inspection report
<br />Attachment 11
<br />- Complaint CO0029141
<br />Attachment 12
<br />- Items submitted in response to July 23, 2008, UST inspection report
<br />Attachment 13
<br />- Items submitted in response to July 23, 2008, hazardous waste
<br />inspection report
<br />Attachment 14
<br />- December 2, 2008, follow up letter to July 23, 2008, UST inspection
<br />report
<br />Attachment 15
<br />- April 17, 2009, follow up letter to July 23, 2008, UST inspection report
<br />Attachment 16
<br />- April 17, 2008, follow up letter to November 17, 2008, hazardous waste
<br />inspection report
<br />Attachment 17
<br />- June 22, 2009, follow up letter to July 23, 2008, UST inspection report
<br />Attachment 18
<br />- Items submitted in response to July 23, 2008, UST inspection report
<br />Attachment 19
<br />- July 30, 2009, routine UST inspection report
<br />Attachment 20
<br />- Items submitted in response to July 30, 2009, UST inspection report
<br />Attachment 21
<br />- Permit application SR0058350
<br />Attachment 22
<br />- September 17, 2009, follow up fax to July 30, 2009, UST inspection
<br />report and November 17, 2008, hazardous waste inspection report
<br />Attachment 23
<br />- Items submitted in response to the September 17, 2009, fax
<br />22