Laserfiche WebLink
structure for the secondary piping and to be "closable" from grade for periodic secondary testing. Test jumper <br /> valve remains open to UDC floor for site operation and is closed only for testing(jumper lead/valve pulled up <br /> to grade via pull cord/leash). Secondary communication will remain testable/provable (from end of piping run <br /> to STP). <br /> I will transmit 48-hour notice of secondary testing as soon as we configure the site (jumper installation) and are <br /> ready to test the site. This will be to satisfy the current 36-mo periodic. <br /> ' Regards <br /> Case Gilson <br /> Armer/Norman & Associates, Inc. <br /> CA License 256896 <br /> 925/671-9200 - Armer/Norman office <br /> 925/499-1032 - mobile (text is best) <br /> case armer-norman.com <br /> 3 <br />