My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2022 10:06:03 AM
Creation date
1/7/2022 10:13:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2016-2017
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> 6. Stormwater management <br /> a. Non-Contact stormwater <br /> Shallow drainage berms will be installed on the south side of Area 2A to direct <br /> stormwater to down drains (Figure 1). The down drains will be installed to <br /> convey the stormwater into the existing retention pond. <br /> b. Contact Stormwater <br /> With the appropriate grading, minimum ponding and infiltration of stormwater is <br /> expected. Stormwater that infiltrates into the refuse will be contained <br /> by Area 2A's LCRS system. <br /> AREA 1 <br /> 1. Grading <br /> The top deck of Area 1 has been graded to drain towards the west with minimum <br /> of 3% slope. Soil berms have been placed on the perimeter of the top deck to <br /> direct stormwater runoff to down drains. <br /> 2. Down Drains <br /> New down drains will be installed on the top deck as shown on Figure 1. <br /> This task is expected to be completed by end of October. <br /> 3. Erosion Control <br /> Side slopes of Area 1 and Area 2A will be track walked to minimize erosion. This <br /> is an ongoing task expected to be completed by end of November weather <br /> permitting (Figure 1). <br /> N:\1 Foothill\Winterization\2016-9-27-FH-16-17 Winterization Plan.docx <br /> FH-2016-17 Winterization Plan Page 2 of 2 Revised 10/4/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.