Laserfiche WebLink
snwc aECTRIc <br />\ METER POLE <br />DATE OF AERIAL PHOTOGRAPHY: 07/10/2015 \ ENTRANCE ROAD <br />10MAJOR CONTOUR INTERVAL SHOWN <br />HORIZONTAL DATUM: CALIFORNIA STATE PLANE <br />COORDINATE SYSTEM ZONE 111 NAD 83 <br />COUNTY OF SAN JOAQUIN ° '°° 2W 500 LFG EXTRACTION WELLS <br />1"=500' <br />=5 ' AND PIPING PLAN <br />DRAWN BY DATE PROJECT ENGINEER DATE T CHECKED DATE <br />J. Acevedo 1f/20115 J. Acevedo 11/23115 1 J. Chandra I »/23/fs <br />SCALE: 1"-250' <br />FOOTHILL SANITARY LANDFILL Sheet No. <br />GAS SYSTEM UPGRADE PHASE 1 4 of 9 <br />....� .., —EDGE OF AREA 1 <br />c - BASE LINER <br />Q , H <br />CONNECTION WELLS (TYP.) <br />a <br />EXISTING 12- HDPE LFG. <br />. sHEADER ABOVE GRADE <br />- <br />_._ .. .. <br />LFG LFG TO <br />FLARE ENERGY <br />STATION PLANT ; <br />,� — <br />1 718114 JA i JC <br />213/8/161JA JC <br />LEGEND <br />PT# <br />NORTHING <br />� <br />ELEVATION <br />FEET <br />�r• <br />I <br />67 <br />� PROPO FG EX TION WELL <br />6437553.680 <br />257.75 <br />CP/ <br />SPINDLE W/FLT-X <br />101 <br />2201903.411 <br />6434707.304 <br />272.65 <br />CP/ <br />1 <br />102 <br />PROPOSED 12" HDPE SDR -17 HEADER <br />o <br />347.21 <br />EXISTING AREA 1 <br />] SIDE SLOPE SLOPE LINER <br />( <br />SPINDLE <br />PROPOSED 6" HDPE SDR -17 ADER <br />= <br />234.23 <br />CP/ <br />REFUSEPROPOSED <br />FILL AREA <br />104 <br />ISOLATION VALVE <br />°1 <br />215.42 <br />EDGE aF EXIS <I <br />.✓ OVER <br />1/2" RB <br />PROPOSED -0— PROPOSED SUMP <br />I EXISTING`HDPE��1ER �71 MODULE 1 <br />✓ � <br />J t <br />�. <br />EXISTING LFG EXTRACTION WELL <br />.. Ld0OU0VER i <br />-4— EXISTING REDUCER <br />.. aro H OPE 5 <br />EXISTING LFG HEADER - 7 <br />HE <br />-, SYSTEM PIPING .HEADER �g� *1 (12X8, -8X6 4 <br />I <br />EXISTING MONUMENTS <br />NEClION TR TION._IO <br />4 <br />�, EXISTING - .I Sao <br />O <br />�• �,��.,>,� ACCESS LOW <br />POINT <br />- 4` LATERAL RAMP .'a <br />z <br />DRAIN (ABOVE. GRADE) 4 % <br />EXISTING LFG�INSTALL HEADER " <br />�XISTING <br />m <br />EXTRACTION WELL ANDERXlSgit <br />2, <br />' ACCESS ROAD <br />- <br />12' E HEAD <br />REDUCER 12X8• NX6 <br />(TYP) 18�HDPE DOWN �iA1N�q, <br />�� PIPE TRENCH <br />2 :.. ,�o •\j? /��,' - <br />4 8 <br />_- HEADER L NT <br />- 4� HOPE CONDENSATE DRAIN <br />`-' - <br />... <br />- - AND.ISOLATION VALVE. <br />IL <br />4 $ UTERAI.t CX 0—AREABORROW <br />MAUI ACCESS ROAD ,. <br />_.. <br />DRAINAGE D rCH," <br />6" HDPE 5 <br />�• A <br />ALONG R)A➢ <br />'- SracING 4 7 <br />4 c ENSA� <br />H.RjJRP AREA <br />4SUMP POLY <br />4-_8 CROSSII LF <br />/ TANK 4 9 <br />2'HOECONDENSATE <br />ABOVE GRADE) <br />`EXISTING ENTRANCE ROAD <br />\ <br />SCALE OUSE _/ ..MOUNT SUMP CONTROL 80X <br />., <br />METER POLE -4. FT ABOVE GRADE <br />.;.. <br />_. <br />IC <br />4 $ TRENCH EXISTING MAIN <br />... <br />ELECTRICAL PANEL <br />240/120 V <br />snwc aECTRIc <br />\ METER POLE <br />DATE OF AERIAL PHOTOGRAPHY: 07/10/2015 \ ENTRANCE ROAD <br />10MAJOR CONTOUR INTERVAL SHOWN <br />HORIZONTAL DATUM: CALIFORNIA STATE PLANE <br />COORDINATE SYSTEM ZONE 111 NAD 83 <br />COUNTY OF SAN JOAQUIN ° '°° 2W 500 LFG EXTRACTION WELLS <br />1"=500' <br />=5 ' AND PIPING PLAN <br />DRAWN BY DATE PROJECT ENGINEER DATE T CHECKED DATE <br />J. Acevedo 1f/20115 J. Acevedo 11/23115 1 J. Chandra I »/23/fs <br />SCALE: 1"-250' <br />FOOTHILL SANITARY LANDFILL Sheet No. <br />GAS SYSTEM UPGRADE PHASE 1 4 of 9 <br />PT# <br />NORTHING <br />EASTING <br />ELEVATION <br />FEET <br />DESCRIPTION <br />67 <br />2200389.460 <br />6437553.680 <br />257.75 <br />CP/ <br />SPINDLE W/FLT-X <br />101 <br />2201903.411 <br />6434707.304 <br />272.65 <br />CP/ <br />1/2" RB <br />102 <br />2201991.827 <br />6438132.499 <br />347.21 <br />CP/ <br />SPINDLE <br />103 <br />2197228.688 <br />6434693.857 <br />234.23 <br />CP/ <br />SPINDLE <br />104 <br />2197223.092 <br />6437974.073 <br />215.42 <br />CP/ <br />1/2" RB <br />snwc aECTRIc <br />\ METER POLE <br />DATE OF AERIAL PHOTOGRAPHY: 07/10/2015 \ ENTRANCE ROAD <br />10MAJOR CONTOUR INTERVAL SHOWN <br />HORIZONTAL DATUM: CALIFORNIA STATE PLANE <br />COORDINATE SYSTEM ZONE 111 NAD 83 <br />COUNTY OF SAN JOAQUIN ° '°° 2W 500 LFG EXTRACTION WELLS <br />1"=500' <br />=5 ' AND PIPING PLAN <br />DRAWN BY DATE PROJECT ENGINEER DATE T CHECKED DATE <br />J. Acevedo 1f/20115 J. Acevedo 11/23115 1 J. Chandra I »/23/fs <br />SCALE: 1"-250' <br />FOOTHILL SANITARY LANDFILL Sheet No. <br />GAS SYSTEM UPGRADE PHASE 1 4 of 9 <br />