Laserfiche WebLink
TEMPORARY SCH 40 PVC SLIP CAP <br />SURFACE 2 LFG EXTRACTION WELL SCHEDULE <br />NOTE: <br />1. DEPTHS ARE APPROXIMATE. ALL <br />DEPTHS ARE NOTED FROM GROUND <br />ELEVATION. ACTUAL GROUND <br />ELEVATIONS MAY HAVE CHANGED. <br />2. WELL LOCATION MAY BE ADJUSTED IN <br />FIELD BY ENGINEER. <br />3. CONTRACTOR SHALL STAKE WELL <br />LOCATIONS. COORDINATES AND <br />ELEVATIONS ARE BASED ON SURVEY <br />INFORMATION PRIOR TO WELL <br />w <br />FINISH GRADE <br />COMPLETION 5 5 <br />SOIL BACKFILL MOUND <br />1 ECOMPACTED SOIL BACKFILL <br />(FT MSL) <br />z <br />(SEE <br />NOTE 1) <br />WELL ID <br />NORTH <br />EAST <br />�--REFUSE-^ <br />0 <br />a <br />WASTE <br />BORE <br />IANDTEC WBS -100 WELL SKIRT 6'X6' <br />PERF. <br />ROCK <br />SECTION <br />OVERUNER <br />(SEE NOTE 4) <br />OIL BACKFILL <br />p <br />6435657.52 <br />�^REFUSE— <br />THICKNESS VARIES(TYP) ,3 <br />o <br />58 <br />33 <br />HDPE OVERUNER. <br />f <br />N/A <br />GX-11 <br />SEE WELL SCHEDULE 5 $ <br />NOTE: <br />1. DEPTHS ARE APPROXIMATE. ALL <br />DEPTHS ARE NOTED FROM GROUND <br />ELEVATION. ACTUAL GROUND <br />ELEVATIONS MAY HAVE CHANGED. <br />2. WELL LOCATION MAY BE ADJUSTED IN <br />FIELD BY ENGINEER. <br />3. CONTRACTOR SHALL STAKE WELL <br />LOCATIONS. COORDINATES AND <br />ELEVATIONS ARE BASED ON SURVEY <br />INFORMATION PRIOR TO WELL <br />w <br />COORDINATES <br />ELEVATION <br />(FT MSL) <br />DEPTHS (FT) <br />(SEE <br />NOTE 1) <br />WELL ID <br />NORTH <br />EAST <br />BOTTOM OF <br />WASTE <br />SURFACE <br />WASTE <br />BORE <br />SOLID <br />PERF. <br />ROCK <br />SECTION <br />OVERUNER <br />(SEE NOTE 4) <br />GX-10 <br />2200374.05 <br />6435657.52 <br />280 <br />358 <br />78 <br />58 <br />33 <br />EXISTS. <br />N/A <br />GX-11 <br />2200126.52 <br />6435974.53 <br />276 <br />361 <br />85 <br />65 <br />33 <br />it <br />N/A <br />GX-12 <br />2199840.78 <br />6436478.32 <br />274 <br />380 <br />106 <br />86 <br />55 <br />N <br />40 <br />GX-13 <br />2199774.13 <br />6436478.18 <br />267 <br />400 <br />133 <br />113 <br />80 <br />3 <br />65 <br />NOTE: <br />1. DEPTHS ARE APPROXIMATE. ALL <br />DEPTHS ARE NOTED FROM GROUND <br />ELEVATION. ACTUAL GROUND <br />ELEVATIONS MAY HAVE CHANGED. <br />2. WELL LOCATION MAY BE ADJUSTED IN <br />FIELD BY ENGINEER. <br />3. CONTRACTOR SHALL STAKE WELL <br />LOCATIONS. COORDINATES AND <br />ELEVATIONS ARE BASED ON SURVEY <br />INFORMATION PRIOR TO WELL <br />w <br />INSTALLATION. <br />wBENTONITE <br />(TYP) <br />4. BENTONITE SEAL REWIRED WHERE <br />weOVERLINER <br />EXISTS. <br />&A <br />SOIL BACKFILL -MAX 12" LIFTS <br />2" KANAFLEX HOSE <br />S <br />THICKNESS VARIES(TYP) <br />N <br />ENTONITE (TYP) �-REFUSE-^ SS BAND <br />CLAMP <br />D <br />-�^ �^ <br />REFUSE <br />" DIA. HDPE SDR -11 <br />ppp <br />oSOLID <br />WELL CASING <br />OIL BACKFILL <br />1/2" DIA. HOLE <br />mCONNECT <br />KANAFLEX HOS <br />(TYP) <br />z <br />KAPS TRANSNET (TN) <br />SS BAND CLAMP <br />6" OLA. <br />s <br />HDPE GEOCOMPOSITE <br />2" DIA WELLHEAD -SEE <br />3 -6" <br />PIPE <br />m <br />NTH 6 oz FABRIC <br />SPECS <br />4X2 REDUCER <br />BUTT FUSION <br />WELD (TYP) <br />90' ELBOW <br />WELLHEAD FERNCO <br />O <br />� <br />COUPLING <br />4" HDPE LATERAL <br />SS CLAMP <br />O <br />DIA. HDPE SDR -11 <br />PERFORATED <br />3% MIN SLOPE <br />BACKFILL <br />W <br />z COURSE AGGREGATE ROUNDED <br />TO 6" HEADER <br />SOIL <br />gc� <br />� <br />PARTICLES 1" TO 3" DIA. <br />NON -CALCEROUS MINIMAL FINES <br />w <br />3 WELL CASING PERFORATIONS <br />off' <br />EXISTING GRADE <br />5 5 SCALE: NTS <br />W <br />WELL CASING 3 <br />Q <br />oN <br />PERFORATIONS 5 5 <br />3 <br />4 PIPE ANCHOR <br />6" HDPE SOLID WELL CASING <br />HDPE SDR -11 FUSED END CAP <br />5 8 <br />BORE DEPTH (SEE WELL SCHEDULE) <br />In <br />N s <br />3 DIA. _ <br />Q <br />v <br />ORE <br />FROM <br />EXTRACTION <br />A <br />BOTTOM OF <br />WASTE (SEE WELL SCHEDULE) <br />WELL <br />D <br />A <br />1 <br />TYPICAL LFG EXTRACTION WELL <br />2 SURFACE COMPLETION <br />m <br />4 5 <br />SCALE: NTS SECTION <br />5 5 SCALE: NTS <br />SECTION <br />COUNTY <br />OF SAN JOA UIN <br />NO SCALE <br />LFG EXTRACTION WELL=FOOTHILL <br />SANITARY <br />LANDFILL <br />Sheet N <br />9Q <br />DETAIL AND SCHEDULEAS <br />SYSTEM UPGRADE PHASE 1 <br />of <br />DRAWN BY <br />DATE PROJECT ENGINEER <br />DATE CHECKED 77 DATE <br />J. Acevedo <br />I»IZO115 J. Acevedo <br />11/23/15 J. Chandra I »/23115 <br />