Laserfiche WebLink
�y <br /> Inspection Report 21 November 2014 Page 3 <br /> Foothill Landfill <br /> 4t. <br /> y <br /> 9. ET cover demonstration area on top deck of Module I. 10. Overside drain on south slope of Module I. <br /> 11. Top deck perimeter berm on Module I (foreground); 12. Storm water pond that drains Modules 1 and I. View <br /> Overside drain to perimeter drain (background). to south from Module I. <br />