Laserfiche WebLink
Inspection Report 21 November 2014 Page 4 <br /> Foothill Landfill <br /> 13. Future M-2A area(foreground); South slope of M-1 14. Landfill gas header pipe serving gas collection <br /> and lower bench (background). View to NW. systems at Modules 1 and I. View to north. <br /> 15. Landfill gas header line to gas-to-energy plant in 16. Condensate return lines from knock-out sumps to <br /> southeast corner of site. LCRS sump. <br />