Laserfiche WebLink
INTRODUCTION.............................................................................................................. <br />General.................................................................................................................. <br />Geology................................................................................................................. <br />LandfillConstruction.............................................................................................. <br />COMPLIANCE HISTORY SUMMARY.............................................................................. 2 <br />CORRECTIVE ACTION ANALYSIS AND CONCLUSIONS..............................................4 <br />REVISED ENGINEERING FEASIBILITY STUDY.............................................................4 <br />Landfill Gas Collection within Module"I"................................................................. 5 <br />Background............................................................................................................ 5 <br />Existing Gas Collection and Control System(GCCS)............................................. 5 <br />Proposed Enhancement Design............................................................................. 5 <br />Landfill Gas Monitoring outside of Module "I" ....................................................... 11 <br />Existing Soil Gas Wells......................................................................................... 11 <br />What is the Extent of Contamination?.................................................................. 13 <br />Proposed Changes to the Monitoring and Reporting Program ............................. 13 <br />VLEACH Modeling................................................................................................ 14 <br />Phasing of the Investigation and Schedule........................................................... 16 <br />FinancialAssurance............................................................................................. 18 <br />Estimated Project Costs....................................................................................... 18 <br />F2TCffJNA <br />Figure 1 Vicinity Map <br />APPENDICES <br />Appendix A Third Quarter 2014 Monitoring Results from MW -3 <br />Appendix B Drawings <br />Appendix C Typical LFG Well Construction Details <br />Foothill Sanitary Landfill j Department of Public Works/Solid Waste <br />Engineering Feasibility Study County of San Joaquin — August 2014 <br />