Laserfiche WebLink
.1 INSPECTIONS <br /> Well installation will be in the presence of EHD inspector. SWD will notify <br /> EHD Unit 6 inspector(s) at least five (5) working days in advance about <br /> the project schedule and the date and time for the first inspection. <br /> Consecutive inspections needed for the project will be scheduled with <br /> EHD inspector on site after the first inspection. <br /> Inspections will be coordinated with EHD for the following work: <br /> 1. Well Installation <br /> 2. Backfill of abandoned borings <br /> SWD understands that drilling the well borehole does not require <br /> inspection by END. . <br /> SWD will schedule inspections with EHD, between 9:00 a.m. and 4:00 p.m <br /> during working days. SWD will pay overtime for inspections that require <br /> overtime hours by EHD staff. <br /> FH-MW-6 GW Weil Installation San Joaquin County <br /> September 17,2014 Department Of Public Works <br /> 3 Solid Waste Division <br />