Laserfiche WebLink
4.0 HEALTH TY PLAN <br /> .1 RESPONSIBILITY FOR SAFETY <br /> Gregg Drilling is required to ensure work area meets all safety <br /> requirements. Gregg Drilling will be responsible for the safety of its <br /> workers during this project. Gregg Drilling will provide a job Forman for <br /> the project that has completed the 40-hour OSHA safety-training course. <br /> Gregg Drilling will provide OSHA training certification of the job Forman <br /> working at the site upon request. <br /> .2 SITE CONDITIONS <br /> The installation of the new GW monitoring well does not include <br /> excavation of refuse or contactwith refuse. <br /> Potential risk with Landfill Gas may be an issue but minimal as the new <br /> GW well is further away from refuse footprint. 'FSL's perimeter LFG <br /> migration monitoring wells have shown methane readings of less than one <br /> percent by volume. The lower explosive limit of methane is five percent by <br /> volume. Potential hazards of methane gas are: fire, explosion and <br /> asphyxiation. <br /> .3 SAFETY PROCEDURES <br /> A. SWD's contractor will conduct a safety meeting with County staff and ' <br /> Contractor's employees before the start of the project. During the first <br /> safety meeting, SWD's Contractor will inform employees not to touch <br /> refuse if encountered. Employees will be asked to wear gloves when <br /> working. <br /> B. Prior to drilling, Underground Service Alert(USA) will be notified. <br /> Presence of overhead power lines will be checked and its clearances with <br /> the drilling equipment. The well locations will be adjusted if needed drill <br /> rig clearances are not met. <br /> FH-[ViW-6 GW Well Installation San Joaquin County <br /> September 17,2014 Department Of Public Works <br /> Solid Waste Division <br />