Laserfiche WebLink
Natalia Subbotnikova [EH] <br /> From: Joyesh Chandra <Jchandra@sjgov.org> <br /> Sent: Thursday, February 05, 2015 7:48 AM <br /> To: Natalia Subbotnikova [EH] <br /> Cc: Taj Bahadori;adam.norvelle@cbi.com <br /> Subject: RE: Foothill-GW MW-6-EHD Inspection <br /> Hello Natalia/Robert <br /> Our driller again encountered some problems with drilling and difficulties determining the ground <br /> water table. With these setbacks, we again have to postpone the EHD inspection to 1.00 pm today <br /> (2/5/15). <br /> Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY I PUBLIC WORKS DEPARTMENT I SOLID WASTE DIVISION <br /> PH:(209) 468-3066 1 Fax:(209) 468-3078 <br /> From: Joyesh Chandra <br /> Sent: Monday, February 02, 2015 7:29 AM <br /> To: Natalia Subbotnikova (nsubbotnikova@sjcehd.com) <br /> Cc: Taj Bahadori; Randy Dockery(rdockery@greggdrilling.com); adam.orvelle@cbi.com; Robert McClellon <br /> Subject: Foothill-GW MW-6-EHD Inspection <br /> Hello Natalia <br /> Gregg Drilling has informed me that they will try to get the drilling done for groundwater well MW-6 <br /> and be ready for the first EHD inspection on Wednesday February 4t" approximately 12:30 <br /> p.m. Please let me know if this date and time is not okay with EHD. <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY I PUBLIC WORKS DEPARTMENT I SOLID WASTE DIVISION <br /> PH:(209) 468-3066 1 Fax:(209) 468-3078 <br /> From: Joyesh Chandra <br /> Sent: Friday, January 23, 2015 2:20 PM <br /> To: Robert McClellon <br /> Cc: Taj Bahadori; Natalia Subbotnikova (nsubbotnikova(&sjcehd.com); Michael Carroll <br /> Subject: Revised Well Permit Application-Foothill-GW MW-6 <br /> Hello Robert <br /> As you had requested, attached is the revised well permit application and service request form based <br /> on the new approved design by the Water Board for Foothill's groundwater monitoring well MW- <br /> 6. Attached also is the work plan with the revised well design figure 2. <br /> Well drilling will begin on February 2nd. We will confirm the date and time for EHD inspection <br /> later. Tentatively, EHD inspection is scheduled for Jan 5t" at 9:00 am. <br /> i <br /> r <br />