Laserfiche WebLink
Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY I PUBLIC WORKS DEPARTMENT I SOLID WASTE DIVISION <br /> PH:(209) 468-3066 1 Fax:(209) 468-3078 <br /> From: DelFrate,Todd@Waterboards [mailto:Todd.Del Frate@waterboards_.ca.gov] <br /> Sent: Thursday, January 22, 2015 11:19 AM <br /> To: Taj Bahadori <br /> Cc: 'Robert McClellon [EH]'; 'Natalia Subbotnikova [EH]'; 'Michael Kith [EH]'; Joyesh Chandra; Michael Carroll; 'Isham, <br /> Julian'; Hold, Howard@Waterboards; Moody, John@Waterboards; Hartzell, Marty@Waterboards; DelFrate, <br /> Todd @Waterboa rds <br /> Subject: RE: Foothill Landfill - Compliance Well MW-6 <br /> Taj,staff approves the revised design discussed in this email with the following conditions. <br /> • Construct the well with 30 feet of well screen. To account for possible rebound of water levels, allow for 5 feet <br /> of well screen above first encountered water and 25 feet below <br /> • Collect split spoon samples every five feet through the saturated zone <br /> • If high plasticity clay or similar low-permeable material is encountered in the saturated zone at a thickness <br /> resembling an aquitard, drilling shall cease and the well shall be constructed <br /> • Centralizers should be used to properly install the well casing <br /> • Well shall be constructed to DWR well standards <br /> Please proceed with your schedule to install well MW-6. Staff will prepare a brief letter to formalize this approval. Also, <br /> please provide a start date a minimum of 48 hours in advance of the drilling. Any questions do not hesitate to call. <br /> From: Taj Bahadori [mailto:tbahadori@sj og v.org] <br /> Sent: Thursday, January 22, 2015 9:53 AM <br /> To: DelFrate,Todd@Waterboards <br /> Cc: 'Robert McClellon [EH]'; 'Natalia Subbotnikova [EH]'; 'Michael Kith [EH]'; Joyesh Chandra; Michael Carroll; 'Isham, <br /> Julian'; Hold, Howard@Waterboards <br /> Subject: Foothill Landfill - Compliance Well MW-6 <br /> Hello Todd, <br /> The County has received your letter response to our revised workplan for Well MW-6.Thank you for a quick turn-around <br /> on this,the County appreciates the CVRWQCB efforts to meet our schedule. <br /> I have discussed your response with our consultant CB&I and we have the following concerns: <br /> • It appears that the Water Board's prediction of annual water level decline is based on an average over an <br /> extended time period, as much as 17 years (1997 to 2014)for some wells. The concern for the review of that <br /> extended period of time, is the fact that the greatest annual degree of decline has occurred within the most <br /> recent period of time. This is due to the pronounced drought that has occurred in the Central Valley, which in <br /> some locations have caused recent annual water declines of over 10 feet. Attached is a spread sheet that <br /> calculates the annual water level decline between 2013 and 2014. During that period of time the annual rate of <br /> decline varied from about 2 to 2%Z feet. The County has proposed the multi-screen well design to take into <br /> account this ominous recent water level decline. The County's concern for future water level decline at their <br /> Foothill Landfill is not that much different from the concerns that the State Resource Control Board appears to <br /> be taking in making water allocations within the Central Valley. <br /> 2 <br />