My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2014-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:07 AM
Creation date
1/7/2022 4:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2014-2015
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017-2018 WINTERIZATION PLAN <br />FOOTHILL LANDFILL <br />For 2017-2018 winterization operations at Foothill Landfill, the following existing <br />winterization measures are in place: <br />MODULE 1 and "I" <br />1. Grading <br />The top deck of Module 1 and "I" has been graded with minimum of 3% slope. <br />Soil berms have been placed on the perimeter of the top deck of Module 1 and "I" <br />to direct storm water runoff to down drains. <br />2. Down Drains <br />Existing down drains will be inspected and repaired as needed. This task is <br />expected to be completed by end of October. <br />3. Erosion Control <br />Side slopes of Module "I" have established vegetation. Side slopes of Module 1 <br />have been track walked to minimize erosion. <br />WINTERIZATION TASKS <br />Following tasks will be completed as part of 2017-2018 winterization: <br />Module 2A <br />IMUTA ii W150J <br />A winter pad will be built in Module 2A for refuse disposal during wet weather <br />(Figure 1). The winter pad will be constructed with six -inches of on-site gravel <br />base placed on compacted refuse. This task is expected to be completed by end <br />of October. <br />2. Customer Haul Road <br />The existing customer haul road from the scale house to Module 2A is an <br />all-weather road. The extension of the customer haul road to Module 2A's winter <br />pad has been built with firmly compacted on-site gravel and sand (Figure 1). <br />FH -2017-18 Winterization Plan Page 1 of 2 Revised 10/3/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.