Laserfiche WebLink
2017-2018 WINTERIZATION PLAN <br />FOOTHILL LANDFILL <br />For 2017-2018 winterization operations at Foothill Landfill, the following existing <br />winterization measures are in place: <br />MODULE 1 and "I" <br />1. Grading <br />The top deck of Module 1 and "I" has been graded with minimum of 3% slope. <br />Soil berms have been placed on the perimeter of the top deck of Module 1 and "I" <br />to direct storm water runoff to down drains. <br />2. Down Drains <br />Existing down drains will be inspected and repaired as needed. This task is <br />expected to be completed by end of October. <br />3. Erosion Control <br />Side slopes of Module "I" have established vegetation. Side slopes of Module 1 <br />have been track walked to minimize erosion. <br />WINTERIZATION TASKS <br />Following tasks will be completed as part of 2017-2018 winterization: <br />Module 2A <br />IMUTA ii W150J <br />A winter pad will be built in Module 2A for refuse disposal during wet weather <br />(Figure 1). The winter pad will be constructed with six -inches of on-site gravel <br />base placed on compacted refuse. This task is expected to be completed by end <br />of October. <br />2. Customer Haul Road <br />The existing customer haul road from the scale house to Module 2A is an <br />all-weather road. The extension of the customer haul road to Module 2A's winter <br />pad has been built with firmly compacted on-site gravel and sand (Figure 1). <br />FH -2017-18 Winterization Plan Page 1 of 2 Revised 10/3/2017 <br />