My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2014-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
CORRESPONDENCE_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:06:07 AM
Creation date
1/7/2022 4:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2014-2015
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Daily Cover Soil <br />Daily cover soil is being stockpiled nearby the winter pad for winter operations. <br />This task is expected to be completed by end of November weather permitting. <br />4. Soil Drainage Berms <br />Soil drainage berms will be installed at the southern edge of Module 2A's top <br />deck to convey storm water runoff to the down drains (Figure 1). This task is <br />expected to be completed by mid-November weather permitting. <br />5. Grading <br />The existing top deck of Module 2A will be graded with 3% slope towards the <br />south to aid storm water runoff and minimize ponding. This task is an on-going <br />task as the refuse is placed. <br />6. Storm water management <br />a. Non -Contact Storm water <br />Shallow drainage berms will be installed on the south side of Module 2A to direct <br />storm water to down drains (Figure 1). The down drains will be installed to <br />convey the storm water into the existing perimeter drainage ditches and retention <br />pond. This task is expected to be completed by mid-November weather <br />permitting. <br />b. Contact Storm water <br />With the appropriate grading, minimum ponding and infiltration of storm water is <br />expected. Storm water that infiltrates into the refuse will be contained <br />by Module 2A's LCRS system. <br />7. Erosion Control <br />Side slopes of Module 2A have been track walked to minimize erosion. <br />N:\1Foothill\Winterization\2017\2017-9-27-FH-Winterization Plan.docx <br />FH -2017-18 Winterization Plan Page 2 of 2 Revised 10/3/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.