My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_2007-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 10:05:26 AM
Creation date
1/11/2022 9:47:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2013
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Integrated Waste Management Board <br /> Disposal Facility Inspection Report (52) <br /> =0 <br /> 39-AA-0004 9/23/2009 LEA Periodic <br /> 4!, 6:30 AM <br /> Foothill Sanitary Landfill Foothill Sanitary Landfill Inc <br /> 6484 North Waverly Road <br /> Michael Kith jJesse Padilla, Landfill Manager <br /> THE ABOVE FACUTY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION SB OF THE PUBLIC RESOURCES COOE(PRC)AND TITLE 14 AND TITLE Y!CALIFORNIA CODE OF REGULATIONS(CCR) <br /> 1m <br /> 3. <br /> J � <br /> X 20921 -Gas Monitoring and Control <br /> Comments:The new gas probes had been installed.The owner/operator has not submitted the as-built plan and the test result of the new <br /> probes. <br /> Submit as-built plan and test result of all new probes. <br /> 00 <br /> a �a�i�ti18t1t c o a t r M <br /> 1.Winter pad has been built. <br /> 2.Concentration to methane gas is 0%D by volume at GP 2 and 4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.