Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for PACIFIC SERVICE STATION as of November10 , 2022 . <br /> Open violations from August 25 , 2022 inspection <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #202 - Failure to retain a paper or electronic copy of the permit to operate at the facility . <br /> OBSERVATION A copy of the UST operating permit was not found on site. <br /> REGULATION GUIDANCE: A copy of the UST operating permit and all attachments and conditions shall be <br /> retained at the facility . <br /> CORRECTIVE ACTION: Immediately obtain a copy of the permit and retain it on site . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #203 - Failure to maintain monitoring records for 36 months and maintenance records for 60 <br /> months. <br /> OBSERVATION Maintenance and monitoring records for the last three years were not found on site . The following <br /> records were not found : <br /> -2021 monitoring system certification and spill container results . <br /> -Overfill prevention results . <br /> -Work order for the replacement of the 87-grade spill container . <br /> REGULATION GUIDANCE: These records shall be maintained on site for at least three years . Monitoring records <br /> include : ( 1 ) date and time of all monitoring or sampling ; (2 ) monitoring equipment calibration and maintenance <br /> records ; ( 3 ) results of any visual observations ; (4 ) results of sample analysis performed a lab or in the field ; ( 5) logs <br /> of all readings of gauges or other monitoring equipment, ground water elevations , or other test results ; (6 ) results of <br /> inventory readings and reconciliations . <br /> CORRECTIVE ACTION : Immediately locate and maintain all missing maintenance and monitoring records for the <br /> last three years on site . <br /> Page 3 of 5 <br />