My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 10:40:31 AM
Creation date
1/11/2022 1:28:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Gast Vacuum Pump /Vacuum Gauges in Hg <br /> Tank ID T1:87 Slave T2:87 Master T3: Diesel T4: 91 <br /> Tank Manufacturer XERXES XERXES XERXES XERXES <br /> Tank Capacity 9490 9490 9490 9490 <br /> Test Start Time 1:30 p.m. 1:45 p.m. 2:10 p.m. 2:25 p.m. <br /> Initial Reading 12" Hg 12" Hg 12" Hg 12" Hg <br /> Test End Time 2:30 p.m. 2:45 p.m. 3:10 p.m. 3:25 p.m. <br /> Final Reading 12" Hg 12" Hg 12" Hg 12" Hg <br /> Change in Reading 0" Hg 0" Hg 0" Hg 0" Hg <br /> Pass/Fail Criteria No loss No loss No loss No loss <br /> Tightness Test Results M Pass ❑ Fail ® Pass ❑ Fail M Pass ❑ Fail I ® Pass ❑ Fail <br /> 7. 'PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/ Nitrogen <br /> Pipe Run ID #1 87 #2 91 #3 Diesel #4 87 Syphon <br /> Pipe Manufacturer Smith Smith Smith Smith <br /> Test Start Time 11:00 a.m. 11:10 a.m. 11:25 a.m. 11:40 p.m. <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 12:00 p.m. 12:10 p.m. 12:25 p.m. 12:40p.m. <br /> Final Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Criteria No loss No loss No loss No loss <br /> Tightness Test Results ® Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Pipe Run ID #5 87M/87S #6 87M/Diese <br /> Pipe Manufacturer Smith Smith <br /> Test Start Time 11:45 p.m. 11:55 P.M. <br /> Initial Reading 5 Psi 5 Psi <br /> Test End Time 12:45 p.m. 12:55 p.m. <br /> Final Reading 5 Psi 5 Psi <br /> Change in Reading 0 Psi 0 Psi <br /> Pass/Fail Criteria No loss No loss <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.