Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMPIUDC TEST s <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard N Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum M Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br /> Sump Manufacturer Environ BRAVO Environ BRAVO <br /> Sump Depth (inches) 29 112" 26 116" 30" 26" <br /> Sump Bottom to Top of 11" 10 112" 11" 12 112" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:00 a.m. 10:00 a.m. 10:20 a.m. 10:20 a.m. <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 10:30 a.m. 10:30 a.m. 10:50 a.m. 10:50 a.m. <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> ass ail Criteria .005130 min. .005130 min. .005130 min. .005130 min. <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID 91 STP Sump 87S STP Sump 87MSTP Sump Diesel STP S <br /> Sump Manufacturer XERXES XERXES XERXES XERXES <br /> Sump Depth (inches) 58" 58" 59" 58 1/2" <br /> Sump Bottom to Top of 31" 32" 32 112" 33 1/2" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:30 a.m. 12:15 p.m. 1:00 P.M. 1:45 p.m. <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 12:00 p.m. 12:45 p.m. 1:30 p.m. 2:15 p.m. <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass ail Criteria .005/30 min. .005130 min. .005130 min. .005130 min. <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail M Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />