Laserfiche WebLink
Page 1 of 3 <br />Natalia Subbotnikova [EA] <br />From: Neil Edgar [Neil@edgarinc.org] <br />Sent: Thursday, May 23, 2013 3:32 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Robert McClellon [EH] <br />Subject: RE: SWFP Application for Tracy Material Recovery <br />Attachments: 170.18.03 Application for SWFP Rev. 051413 rev. page 1.pdf; 170.18 CDI FacReport 050813 <br />revised - Clean.pdf; 170.18 CDI FacReport 050813 revised - Markup.pdf; 170.18 Tracy RCSI <br />050813 rev. - Clean.pdf; 170.18 Tracy RCSI 050813 rev. - Markup.pdf; 170 18 Tracy OIMP <br />050913 rev. - Markup.pdf; 170.18 Tracy OIMP 050913 rev. - Clean.pdf; Expansion Tracy TPR <br />050913 revised - Clean.pdf; Expansion Tracy TPR 050913 revised - Markup.pdf; ECS AC <br />Composter and CompDog Systems.pdf; 170.18 TRACY Load Check Program 052313 - <br />Clean.pdf; 170.18 TRACY Load Check Program 052313 - Markup.pdf <br />Natalia — <br />I have made your requested revisions to the documents in the SWFP Application package as described below: <br />® In an effort to provide consistency with the existing permit for the facility, I have made revisions to the <br />attached key documents only changing the name of the facility to its historical name, unless otherwise <br />noted below: <br />o Tracy Material Recovery & Transfer Facility (although I have left "Tracy Material Recovery 'and' <br />Transfer Facility" as being equivalent in all cases) <br />® RCSI, page 2 has been corrected to "Department" <br />® In the RCSI, Page 11, 1 have indicated that any windrowing of digestate would occur only following a <br />demonstration project with the material. <br />• 1 have included the "ECS AC Composter and CompDog Systems" fact sheet for reference and insertion <br />into Appendix D, as noted on page 15. <br />• On RCSI, page 19 and OIMP, page 1, 1 have changed the name to Tracy Material Recovery & Transfer <br />Facility, as noted above. <br />• The Table of Contents of the Load Check Program has been corrected, in addition to the indicated typo <br />on page 1. <br />® Additionally, I have revised page 1 only of the SWFP Application form with the name change. <br />Attached are clean and markup versions of the TPR, CDI Facility Report, RCSI, GIMP, and Load Check Program, <br />overwhelmingly due to name changes in the header on all pages. <br />If this seems like overkill, I am happy to provide only individual pages where revisions were requested and leave <br />the facility name issue alone. <br />Thank you, <br />RE <br />j1iu, <br />Neil S.R. Edgar <br />Edgar & Associates, Inc <br />1822 21st Street <br />Sacramento, Ca 95811 <br />(916) 739-1200 <br />(916) 739-1216 Fax <br />5/24/2013 <br />