Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID 91 Fill DSL Fill 87 Fill <br /> Sump Manufacturer Western Fiberglass Western Fiberglass Western Fiberglass <br /> Sump Depth (inches) 482 48" 48" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration N/A N/A N/A <br /> (inches) <br /> Test Start Time 10:28 am 7:56 am 6:46 am <br /> Initial Reading 5.9035 2.7804 3.2082 <br /> Test End Time 10:43 am 8:11 am 7:02 am <br /> Final Reading 5.9030 2.7801 3.2069 <br /> Change in Reading 0.0005 0.0003 0.0013 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID UDC 1/2 UDC 5/6 <br /> Sump Manufacturer Bravo Steel Bravo Steel <br /> Sump Depth (inches) 122 12" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 42 4" <br /> (inches) <br /> Test Start Time 9:02 am 9:02 am <br /> Initial Reading 2.3688 1.5619 <br /> Test End Time 9:17 am 9:17 am <br /> Final Reading 2.3674 1.5618 <br /> Change in Reading 0.0014 0.0001 <br /> Pass/Fail Criteria 0.002 0.002 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />