Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Resealed Bravo Hub and Conduit Penetration to 87 Product Piping in UDC 1/2, 7/8-Retested and Passed. <br /> Installed Bravo Hard Fittings in 87,91, Diesel Fill sumps -Retested and Passed. <br /> UDC 1/2 Resealed Conduit Penetration -Retested and Passed. <br /> UDC 5/6 Resealed Bravo Hub-Retested and Passed. <br /> No Inspector Present. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />