My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 10:24:25 AM
Creation date
1/24/2022 11:07:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANOAQU I N Environmental Health Department <br /> COU NI T Y I Y Time In: <br /> + _,fr Time Out: <br /> . •- Greotr+ess �row3 here, <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO 02093 Date: 01/27/2022 <br /> Address: 3425 TRACY BLVD , TRACY 95376 <br /> Requestor: MERLIN BOWEN, GETTLER RYAN, INC. Telephone: (925)551-7555 <br /> Program Element: 2309-UST RETROFIT-Minor Plan Check Request#: SR0084774 <br /> Inspection Type: 298-UST RETROFIT REPAIR INSPECTION <br /> Onsite Service Technician: Darnell Smith ICC Service Tech/Installer Exp. Date: 11/17/2023 <br /> Manufacturer training: FF, 04/20/22 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site inspection: <br /> -Verification that drop tubes are at 95%tank volume shut off(tank 1 at 91.02%, tank 3 at 91.65%) <br /> -Verified calculations and tank charts <br /> -Verified flapper functionality on 87 tank 1 and 87 tank 3 drop tubes <br /> -Verified ball floats are not installed. Spoke with technicians on site and they stated that they removed all ball floats at all BP <br /> sites when the first drop tubes were installed. Technicians removed vapor caps on all 4 tanks(three 87s and one 91)to show <br /> no ball floats were installed. No ball floats were observed down the pipes. <br /> This facility is approved to receive fuel in the 87 tanks(tank 1 and 3). Tank 1 is the far east tank,tank 3 is the second to the <br /> last tank to the west. <br /> To minimize person to person contact EHD is choosing to write the name of the person receiving the report instead of having <br /> them sign. <br /> Inspection report emailed to: <br /> -Merlin Bowen <mbowen@grinc.com> <br /> -Kimberly Medicus<Kimberly.medicus@bp.com> <br /> -Gettler Ryan Testing <grtesting@grinc.com> <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: Emailed to Merlin Bowen, Contractor/ <br /> EH Specialist: CAROL PRESTO Phone: (209)616-3061 <br /> FA0003627 SR0084774 SC298 01/27/2022 <br /> EHD 23-01 Rev.09/16/2020 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.