Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 Main 87 Aux. 87 Siphon 91 <br /> Are both vent and tank riser piping �/ Yes �/ Yes �/ Yes Yes <br /> secondarily contained? No No No No <br /> OPE Model OPW OPW OPW OPW <br /> What is the OPE response when activated? 21 Shut off �/ Shut off A Shut off AShut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> estricts estricts estricts estricts <br /> Flow Flow Flow Flow <br /> Audible Audible DAudible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* Yes* LJ Yes* <br /> that may interfere with the OPE operation? No No �/ No V/ Na <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank so" 80.25" 80.25" so" <br /> What is the percent capacity of the tank at <br /> 94.66% 94.86" 94,86" 94.65 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to k/ Yes �/ Yes �/ Yes �/ Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level? <br /> T. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results / Pass �/ Pass r/ Pass �/ Pass <br /> Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> 17 Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />