My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
5777
>
2300 - Underground Storage Tank Program
>
PR0505746
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2022 4:53:19 PM
Creation date
1/24/2022 3:10:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0505746
PE
2361
FACILITY_ID
FA0006977
FACILITY_NAME
76 EXPRESS TIGER NO 1
STREET_NUMBER
5777
Direction
S
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
19302037
CURRENT_STATUS
01
SITE_LOCATION
5777 S FRENCH CAMP RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 11&12 UDC 13&14 UDC 15&16 UDC16S&17S <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 8" 8" 9" 9" <br /> Sump Bottom to Top of BP BP BP BP <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:32 10:37 10:40 10:45 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:02 11:07 11:10 11:15 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results M Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail N Pass ❑ Fail <br /> Sump/UDC ID UDC 17&18 UDC18S&19S UDC 19&20 UDC 20S <br /> Sump Manufacturer Bravo Bravo Bravo Bravo <br /> Sump Depth (inches) 9" 9" 9" 9" <br /> Sump Bottom to Top of BP BP BP BP <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:17 11:22 11:27 11:32 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:47 11:52 11:57 12:02 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.