Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID UDC 9/10 <br /> Sump Manufacturer opw <br /> Sump Depth (inches) 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 18" <br /> (inches) <br /> Test Start Time 12:40 pm <br /> Initial Reading 3.3388 <br /> Test End Time 12:55 pm <br /> Final Reading 3.3382 <br /> Change in Reading 0.0006 <br /> Lss/FailCriteria o.002 <br /> htness Test Results 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Lss/FailCriteria <br /> htness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />