Laserfiche WebLink
REVISED STORM DRAINAGE FACILITIES Figure 11 <br /> FOR TRI-STATE/CHENG PARCEL <br /> Completed Detention Basin <br /> (Phase II[) <br /> T <br /> `3 Discharge from <br /> Area"C" Detention Basin <br /> Drainage"B" <br /> v Delete Earthen <br /> Ditch(Pipe has been completed) <br /> r , <br /> ,y Draina "A" Delete r <br /> Temporary Detention Basin <br /> (Phase 11) <br /> Public Storm <br /> Drain Lines / <br /> Stub Out Here <br /> 36" \ h! <br /> 42 enaora <br /> I8 <br /> uC�o C+a�a' <br /> ll a <br /> 1' r'id <br /> 42" Schulte Road <br /> 9pno, 6 <br /> Safeway <br /> Detention <br /> +� Safeway Basin <br /> Detention ❑ <br /> Basin <br /> blidtvay Road — <br /> i <br /> Legend <br /> 1994 Special Purpose Plan Boundary <br /> ® Amendment Area <br /> —� Surface Drainages <br /> 0 2000 Feet <br /> Note:Proposed alignments are in generalized locations. B AffmE <br /> D:\9323lao\Graphics\9323110(Visual Cadd) 1025/99. <br />