Laserfiche WebLink
REVISED STORM DRAINAGE FACILITIES Figure 11 <br /> FOR TRI-STATE/CHENG PARCEL <br /> Completed Detention Basin <br /> (Phase III) <br /> T <br /> Discharge from <br /> Area"C" n Detention Basin <br /> Drainage"B" <br /> �/. v Delete Earthen <br /> Ditch(Pipe has been completed) <br /> j Z — <br /> c C <br /> �> Draina "A" <br /> Delete <br /> Temporary Detention Basin <br /> (Phase 11) <br /> Public Storm <br /> Drain Lines <br /> Stub Out He ; • % -3 �% <br /> '36" \ a <br /> Is <br /> v0 C <br /> 01>, <br /> Schulte Road <br /> ;6 <br /> Safeway <br /> QDetention <br /> Safeway Basin <br /> Detention <br /> Basin O <br /> Midway Road — — <br /> Leaend <br /> ....`.............--... 1994 Special Purpose Plan Boundary <br /> Amendment Area <br /> — —� Surface Drainages <br /> 0 2000 Feet <br /> Note:Proposed alignments are in generalized locations. B ASELIL�' i' <br /> D:\9323lao\Graphics\9323110(Visual Cadd) 1025/99 <br /> -20- <br />