My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014609
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
0
>
2600 - Land Use Program
>
S-78-11
>
SU0014609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 12:53:50 PM
Creation date
2/3/2022 11:30:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014609
PE
2600
FACILITY_NAME
S-78-11
STREET_NUMBER
0
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
APN
08329010
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
HAMMER LN
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1, 11. K[I IN I I I [R� & AY�(W I I I File No. S-2008-1 <br /> June 27 , 1973 <br /> PAGE TWO <br /> drilling and our examination of the soil samples , it does <br /> not appear that this water represents a static groundwater <br /> level. It is very likely, .however, that this perched water <br /> will exist while the fields north of this property are <br /> under irrigation. <br /> We understand from Mr. Gama that an equivalent fluid <br /> pressure of 36 pounds per cubic foot has been assumed in <br /> design of the pumping station walls . It is our opinion that <br /> this equivalent fluid pressure is appropriate, assuming that <br /> an open excavation will be made and that sandy backfill will <br /> be placed adjacent to the walls of the sunip. <br /> It appears from Test Boring 5 that water will be <br /> encountered during excavation for the Eumpino facility near <br /> Lots 113 and 114 . Based on the availa le da0ta , we anticipate <br /> that the flow of water can be handled during construcLion by <br /> a sump and pump system. However, we recommend that you <br /> consider installing permanent drains to relieve hydrostatic <br /> pressure on the walls of the pumping station., <br /> The subsurface data collected to date does not indicate <br /> a perched water condition near the pumping station south <br /> of the East Bay Municipal Utility District easement . <br /> Our laboratory testing, and preparation* of recommendations <br /> for site preparation and grading, foundations , floor slabs , <br /> and other data for the proposed subdivision are in progress . <br /> We will transmit the results of this information as soon as <br /> it is available. <br /> If you have any questions regarding this letter, please <br /> contact us . <br /> Respectfully submitted, <br /> J. H. KLEINFELDER AND ASSOCIATES <br /> Richard M. Wary <br /> RMW:pjr <br /> Attachments (4) <br /> cc wl Attchs . : Schmid Development, Inc . (3) <br /> Attention : Mr. Lew Schmid <br /> Schmid Development, Inc. <br /> Attention: Mr. Mike Mensinger <br /> Marshall Dunlap, C . E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.