Laserfiche WebLink
REPAIR OF DAMAGES <br /> The Contractor will be held responsible for the condition of the work until <br /> the final acceptance by the Owner and will be required to repair any and <br /> all damages which may occur before its final acceptance. <br /> RESPONSIBILITY OF BIDDER <br /> The Contractor shall, prior to the bid, by examination satisfy himself as <br /> to the nature and location of the work, the conformation of the ground, the <br /> character, quality and quantities of the materials to be encountered, the <br /> character of equipment and facilities needed preliminary to, and during <br /> the execution of the work, the general and local conditions, and all other <br /> matters which can in any way effect the work under this Contract. The <br /> Contract will not be awarded to any bidder who cannot give satisfactory <br /> assurance of his ability to carry out the Contract if it is awarded to him. <br /> INTERPRETATION OF PLANS <br /> The plans for the work show conditions as they are supposed to be or <br /> believed to exist, but it is not intended or to be inferred that the con- <br /> ditions as shown thereon constitute a representation by the Owner or his <br /> representatives that such conditions are actually existant, nor shall the <br /> Owner or his representatives be liable for any loss maintained by the <br /> Contractor as a result of any variance between conditions shown upon the <br /> plans and the actual conditions revealed during the progress of the work <br /> or otherwise. <br /> INTERPRETATION OF SPECIFICATIONS <br /> These specifications are intended to be self explanatory but should any <br /> misunderstanding or controversy arise as to the interpretation of anything <br /> contained herein, the matter shall be referred to the Engineer for decision <br /> and the decision of the Engineer shall be final. The Contractor will not <br /> be allowed to take advantage of errors or omissions that may occur in these <br /> specifications. Remedial instructions will always be given when such <br /> errors or omissions are discovered. <br /> RIGHT TO ASSURE COMPLETION OF WORK <br /> If at any time t y PrIr ad'' by he CUntY ctor o r74 qrtl9f ork <br /> described heren and 'the material, equipment; and/qk jabciwf , ished <br /> by the Contracto fbi' said work, shatF'ir+the:juejgerri�nCaf�Y l gineer, <br /> be insufficient to give feasorrabiz,assuranceof. the completion of the work <br /> r <br /> within the Contract peHod; -the-Ehgaraeemaynottfyxb@i�. +ontractor in <br /> writing to µdo su h additional equipment; materials, and/or labor <br /> 1:;fac age:cy <br /> ..................................... <br /> Uwner .............................................. <br /> ❑ Engineer .............................................. <br /> [� architect ......................... ......,.......,............_ <br /> �] Other ..................._}�. .. ..................... . e....,.,- .,.;.... , , <br />